B, Additions: <br />1. The Contractor shall verify the locations of all utilities by contacting Holey Moley at 1-800-382-5544 <br />at least two (2) working days, not counting Saturdays, Sundays or federal and state holidays before <br />proceeding with construction. It shall also be the Contractors responsibility to contact any other <br />utility that is not contacted by Haley Moley and verify the utility locations. <br />2. The Contractor shall be responsible for working with the other utilities, i.e., gas electric, telephone, <br />etc. in order to assure that all utilities that need to be replaced or relocated can be done with a <br />minimum disturbance to service. The Contractor shall also be responsible for coordinating <br />schedules with the various utilities such that they can proceed with their relocation work as <br />efficiently as possible. <br />3. If the odor of natural gas is detected in a work area at any time during the course of work, the <br />Contractor shall immediately notify NIPSCO at 1-800-634-3524, The Contractor shall also <br />immediately notify the residents of adjacent properties. The Contractor shall advise the residents <br />to evacuate their homes immediately if the odor is present within the dwelling. <br />4. Restoration of sprinkler systems damaged by the Contractor's operations shall be repaired by the <br />Contractor at no additional cost to the City or the Owner of the system. <br />XVI. MAINTENANCE OF TRAFFIC <br />A. Prevailing Specifications: 2016, INDOT Standard Specifications Sections 105 & 801 <br />B. Additions: <br />1. Maintenance of traffic during construction shall conform to the "Indiana Manual on Uniform Traffic <br />Control Devices" (IMUTCD) and the City of South Bend Design and Construction Standards. The <br />contractor shall provide all signs and barricades that conform to the IMUTCD. <br />2. The attached "Traffic Closure Request" form is to be used for any lane restrictions or closures and <br />required to be filled out and sent to the Department of Public Works a minimum of five (5) calendar <br />days prior to the work impacting traffic. <br />3. The Contractor shall arrange and prosecute the work specified for this contract in such a manner <br />that traffic on existing streets is unrestricted throughout the Project. The Engineer shall approve <br />the method of traffic control. No construction equipment, vehicles, materials, supplies or temporary <br />facilities shall be left unattended in the right-of-way of any street or left parked overnight without <br />proper marking and lighting. <br />4. After the award of the contract and before beginning the work, the Contractor shall submit his <br />proposed schedule of operations for the review of the Engineer. The schedule of operations as <br />reviewed by the Engineer shall be maintained at all times. <br />5. There will be no direct payment for this work. Any Maintenance of Traffic shall be considered <br />incidental. <br />XVII. DESCRIPTION OF WORK <br />A. Prevailing Specifications: None <br />B. Additions <br />1. Work to be performed shall include furnishing all labor, services, materials, insurance and <br />equipment to perform tree and stump removals as identified in these Specifications. <br />2. The Contractor shall preserve and protect all surrounding property, structures, tenants, visitors and <br />their property from damage caused by the Contractor's operations. <br />XVIII. TREE AND STUMP REMOVALS <br />A, Prevailing Specifications: 2016, INDOT Standard Specifications Sections 201, 211, and 621 <br />B. Additions: <br />1. The tree and stump removal schedule is provided in the summary table included in these <br />Specifications. <br />Version 10/18/2016 Page - 5 Public Works Quote <br />