My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Quote Opening - Fire Dept Training Center Site Improvements - TX Concrete
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Opening of Quotations/Proposals
>
Quote Opening - Fire Dept Training Center Site Improvements - TX Concrete
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 2:00:04 PM
Creation date
4/13/2017 9:47:39 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/11/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7. The use of slag or local aggregate will not be permitted. <br />8. Payment shall be made at the Unit Price specified in the Proposal as follows: <br />CONCRETE SIDEWALK, 4-INCN.... CIO ....... SY <br />XXI. TREE GRATE, INSTALL <br />A. Prevailing Specifications: None <br />B. Additions <br />1. The work shall consist of installing one (1) tree grate and frame assembly, including all necessary <br />incidentals. <br />2. Tree grate and frame assembly, including all hardware, shall be provided by the City. Contractor <br />shall be responsible for picking up and delivering the materials to the site. Contractor shall <br />coordinate pick-up and delivery with the City. <br />3. The tree grate shall be installed around an existing tree. The contractor shall clear the tree pit area <br />of all existing crushed concrete and other debris, and will use care to ensure that the existing tree <br />roots are not damaged during installation. <br />4. Tree grate shall be 4'x6' and shall be installed with the provided Neenah frame R-8500-U. <br />5. Payment for tree grate installation shall be made at the Unit Prices for the various items bid in the <br />Proposal as follows: <br />TREE GRATE, INSTALL .....4n......... EA <br />XXII. ADJUST STRUCTURES TO GRADE <br />A. Prevailing Specifications: 2016, INDOT Standard Specifications Section 720 <br />B. Additions. <br />1. As specified on the plans, any existing structures, including castings and water valves, that <br />require adjustment shall be adjusted to match the finished grade. <br />2. Chimney seal application shall comply with Specification 2100 of the City of South Bend <br />Prevailing Specifications. <br />3. Adjustments to structures shall not be measures or paid for directly but shall be considered <br />incidental to the remaining' work and included in the cost of other Pay Items. <br />Version 10/18/2016 Page - 7 Public Works Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.