My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Jones Petrie Rafinski - Design of Leighton Plaza and Field Surveys
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
PSA - Jones Petrie Rafinski - Design of Leighton Plaza and Field Surveys
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 9:41:41 AM
Creation date
4/13/2017 9:44:28 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
4/11/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This is EXHIBIT C, consisting of 4 pages, referred to in <br />and part of the Agreement between Owner and Engineer for <br />Professional Services dated , <br />Payments to Engineer for Services and Reimbursable Expenses <br />COMPENSATION PACKET BC-1: Basic Services — Lump Sum <br />Article 2 of the Agreement is supplemented to include the following agreement of the parties: <br />ARTICLE 2 — OWNER'S RESPONSIBILITIES <br />C2.01 Compensation for Basic Services (other than Resident Project Representative) — Lump Sum Method <br />of Payment <br />A. Owner shall pay Engineer for Basic Services set forth in Exhibit A, except for services of <br />Engineer's Resident Project Representative, if any, as follows: <br />1. A Lump Sum amount of $189,710.00 based on the following estimated distribution of <br />compensation: <br />A. Downtown South Bend Cross Streets <br />1) <br />Topographic Survey Activities: <br />$51,860.00 <br />2) <br />Utility Coordination: <br />$1,850.00 <br />3) <br />30% Submittal -- Schematic Design Phase: <br />$13,500.00 <br />4) <br />60% Submittal — Design Development Phase: <br />$18,000.00 <br />5) <br />90% Submittal - Construction Documents <br />$30,375.00 <br />6) <br />100% Submittal - Construction Documents <br />$10,125.00 <br />7) <br />Bidding and Negotiating Phase <br />$4,500.00 <br />8) <br />Construction Services (Hourly, Not to Exceed) <br />$13,500.00 <br />Total Estimate Lump Sum Fee, Downtown Cross Streets <br />$143,710.00 <br />B. Leiahton Plaza Scullature and Water Feature <br />1) <br />Topographic Survey Activities: <br />$3,765.00 <br />2) <br />Coordination and Pre -Engineering: <br />$1,150.00 <br />3) <br />Construction Documents: <br />$9,500.00 <br />4) <br />Bidding and Negotiating Phase: <br />$1,150.00 <br />5) <br />Construction Services, (Hourly, Not to Exceed) <br />$3,250.00 <br />Total Estimated Lump Sum Fee, Leighton Plaza <br />$18,815.00 <br />C. Michigan Street Improvements <br />1) Topographic Survey Activities: $27,185.00 <br />Total Estimated Lump Sum Fee, Michigan Street $27,185.00 <br />2. Engineer may alter the distribution of compensation between individual phases noted herein <br />to be consistent with services actually rendered, but shall not exceed the total Lump Sum <br />amount unless approved in writing by the Owner. <br />Page t <br />Exhibit C ---Compensation Packet BC-1: Basic Services (ather than RPR) — Lump Sum Methad of Payment <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.