My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project Completion Affidavit - WWTP Grit and Screenings Improvements - Proj No 114-075R - Thieneman Construction, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Project Completion Affidavits
>
Project Completion Affidavit - WWTP Grit and Screenings Improvements - Proj No 114-075R - Thieneman Construction, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 2:52:40 PM
Creation date
4/13/2017 9:40:03 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/11/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MAINTENANCE BOND <br />Bond No. 58727962 <br />KNOW ALL PEOPLE BY 'THESE PRESENTS: <br />That we, THIENEMAN CONSTRUCTION, INC., 17219 Foundation Parkway, Westfield, IN 46074 <br />(hereinafter called CONTRACTOR), and WESTERN SURETY COMPANY --, a <br />corporation organized under the laws of the State of South Dakota and <br />authorized to do a surety business in the State of Indiana, (hereinafter called Surety), are held and firmly bound <br />unto the City of South Bend, Indiana (hereinafter called the OWNER) in the suns of , **-*$J <br />lawful money of the United States of America, for the payment of which sum, well and truly to be made, we <br />bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by <br />these presents. <br />WHEREAS, said CONTRACTOR has performed for the City of South Bend, Indiana <br />improvements, which have been or are about to be completed and accepted by the OWNER for the project <br />known as: <br />GRIT AND SCREENINGS IMPROVEMENTS <br />PROJECT NO. 114-075 <br />AND WHEREAS, it is required that the CONTRACTOR should guarantee the project from defects <br />e�-: <br />caused by faulty or defective materials, workmanship, or desig :for a period of fl1rqLXeqr6 from and after the <br />date of acceptance of the completed project by the OWNER. <br />" J <br />NOW, THEREFORE, if the CONTRACTOR shall for a period of titre ea . from and after the date <br />of acceptance of the completed project by the OWNER replace any and all defects arising in said work <br />whether resulting from faulty or defective materials, workmanship, or design, then the above obligation shall <br />be null and void; otherwise the obligation shall remain in full force and effect for tltrce_kears from the date of <br />acceptance of the completed project by the OWNER. <br />The OWNER shall notify the CONTRACTOR in writing of any defects for which the <br />CONTRACTOR is responsible and shall specify in said notice a reasonable time within which the <br />CONTRACTOR shall have to correct said defects. If the CONTRACTOR fails to correct said defects within <br />the time specified in said notice, the OWNER, in its discretion, may permit the Surety to correct said defects. If <br />SB Grit and Screenings Improvements <br />Project No. 0787S 0061 31-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.