Change Order No. 7 - East Bank Sewer Separation Phase 5 Division B - Walsh & Kelly, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Change Orders
>
Change Order No. 7 - East Bank Sewer Separation Phase 5 Division B - Walsh & Kelly, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 2:58:00 PM
Creation date
4/13/2017 9:24:38 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/11/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of South Bend Project No, 114-062B <br />OWNER: City of South Bend <br />ENGINEER: City of South Bend Engineering <br />Kara M. Boyles, P.E. <br />Professional Engineer No. 10809510 <br />CONTRACTOR: Walsh & Kelly, Inc. <br />Change Order No. 7 — 415117 <br />PROJECT: East Bank Sewer Separation — Phase 5 (Division B) <br />Project No. 114-062B <br />SUBJECT: Change Order Explanation <br />ISSUE DATE: April 5, 2017 <br />This Change Order to the Contract document shall supplement, amend, and shall become a <br />part of, and be incorporated as an Addendum to the Contract. <br />The following is a summary and description of the revisions to the Contract by this Change <br />Order: <br />Item <br />QtV <br />Unit Price <br />Days <br />Total <br />1. Abutment Removal <br />1 <br />LS $20,000.00 <br />5 <br />$20,000.00 <br />2. Sewer Lining Increase <br />1 <br />LS $15,000.00 <br />0 <br />$15,000.00 <br />3. Time Extension <br />NIA <br />NIA NIA <br />14 <br />$0.00 <br />Net Change Order amount $35,000.00 <br />1) An existing railroad abutment was found along St. Peter St directly in the path of the new <br />storm sewer installation. The structure will need to be removed in order to continue installations. <br />2) Sewer lining unit prices have increased for the new calendar year. Bids were submitted in <br />2015 and there are new costs associated with performing the lining this year. <br />3) The time extension is to cover the last two weeks from November 2016 when no work could <br />be performed before the winter months (December -March). <br />