Laserfiche WebLink
Installation List <br />Page 4 of 6 <br />CUSTOMER E UIPMENT QTY/SIZE DATE <br />Apopka, FL Klampress (1) Size 3 2012 <br />748 east Cleveland Street <br />Apopka, FL 32703 <br />Kevin Burgess <br />407-703-1731 <br />Scope: Site rebuild to "like new" condition consisting of new 2 9/16" roller assemblies, all new <br />wear pans, new hydraulic system, new electrical system, new drive gearing, new set of filter belts <br />and new hydraulic unit retrofit lid assembly. All site labor performed by Ashbrook's personnel. <br />Gloucester County WWTP Klampress (1) Size 3 2011 <br />2 Paradise Road <br />West Deptford, NJ 08066 <br />Robert Gezzi <br />856-423-3500 <br />Scope: Site rebuild to "like new" condition consisting of new 2 9/16" roller assemblies, new main <br />frames, all new wear parts, new hydraulic system, new stainless steel drain pans, new stainless <br />steel washboxes, new electrical system, new drive gearing, new set of filter belts and new hydraulic <br />unit retrofit lid assembly. All site labor performed by Ashbrook's personnel. <br />McCain Foods Klampress (2) Size 3 2011 <br />Hwy 54 & 11 e Street <br />Plover, WT. 54467 <br />Don Ward <br />715-459-2872 <br />Scope: Complete factory rebuild to "like new" condition consisting of recoating of existing rollers, <br />replacement of all wear components, new lower maintenance bearing assemblies, new stainless <br />steel drain pans, new hardware, new washboxes, new hydraulic cylinders, new chicane assemblies, <br />new belt drive units, re-galvanize/paint main frame and all other carbon steel components, new <br />hydraulic units and new filter belts. Each machine was disassemble and reassembled on site. All <br />machine components were returned to Ashbrook's factory for reconditioning. All site labor was <br />performed by Ashbrook with assistance by local Contractor. <br />Princeton, IN Klampress (1) Size 3 2011 <br />220 S. Richland Creek Drive <br />Princeton, IN 47670 <br />Bill Eubanks <br />812-385-3343 <br />Scope: Complete factory rebuild to "like new" condition consisting of recoating of existing rollers, <br />replacement of all wear components, new lower maintenance bearing assemblies, new stainless <br />steel drain pans, new hardware, new washboxes, new hydraulic cylinders, new chicane assemblies, <br />new belt drive units, re-galvanize/paint main frame and all other carbon steel components, new <br />hydraulic units and new filter belts. Each machine was disassemble and reassembled on site. All <br />machine components were returned to Ashbrook's factory for reconditioning. <br />