Laserfiche WebLink
Installation List <br />Page 2 of 6 <br />CUSTOMER EQUIPMENT OTY/SIZE DATE <br />Scope: Complete site rebuild. Work consisted of new roller assemblies, new stainless steel drainage <br />pans, new fiberglass cylinders, new electrical system, new stainless steel washboxes, new <br />washtubes, new gravity drainage grids, new drive gears and new filter belts. All site labor <br />performed by Ashbrook's personnel. <br />Deland, FL Klampress (1) Size 3 2013 <br />1101 South Amelia Ave. <br />DeLand, FL 32724 <br />Jody Hansen <br />386-740-6855 <br />Scope: Site rebuild to "like new" condition consisting of new 2 9/16" roller assemblies, all new <br />wear parts, new hydraulic system, new electrical system, new drive gearing, new set of filter belts <br />and new hydraulic unit retrofit lid assembly. All <br />Moundsville, WV Klampress (1) Size 2 2013 <br />1700 Lafayette Ave. <br />Moundsville, WV 26041 <br />Tim Minor <br />304-845-8973 <br />Scope: Complete site rebuild. Work consisted of reconditioned roller assemblies, new fiberglass <br />cylinders, new electrical system, new stainless steel washboxes, new washtubes, new gravity <br />drainage grids, new drive gears and new filter belts. All site labor performed by Ashbrook's <br />personnel. <br />Palmetto, FL Klampress (1) Size 2 2013 <br />1310 28t' Avenue <br />West Palmetto, FL 34221 <br />Ray D'Aiuto <br />941-723-6106 <br />Scope: Complete site rebuild. Work consisted of new roller assemblies, new fiberglass cylinders, <br />new electrical system, new stainless steel washboxes, new washtubes, new gravity drainage grids, <br />new drive gears and new filter belts. All site labor performed by Ashbrook's personnel. <br />Brazos River Authority Klampress (1) Size 1 2012 <br />Richwood/Clute WWTP <br />Clute, TX <br />Greg Graf <br />281-795-8420 <br />Scope: Complete site rebuild. Work consisted of re -galvanizing all carbon steel machine <br />components, rework roller assemblies, new stainless steel drainage pans, new fiberglass cylinders, <br />new hydraulic system, new electrical system, new stainless steel washboxes, new washtubes, new <br />gravity drainage grids, new drive gears and new filter belts. All site labor performed by Ashbrook's <br />personnel. <br />