My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Award Quotation - Fire Dept. Training Center Site Improvements Proj No 117-013 - TX Concrete
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Award Quotations/Proposals
>
Award Quotation - Fire Dept. Training Center Site Improvements Proj No 117-013 - TX Concrete
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 1:43:27 PM
Creation date
4/13/2017 8:54:03 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/11/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
INTER -OFFICE MEMORANDUM <br />DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF STREETS <br />TO; Linda M. Martin, Clerk <br />Board of Public Works <br />FROM; Kevin Fink, Project Engineer <br />SUBJECT: Project 117-013 Quote Award <br />DATE: April 11, 2017 <br />On April 11, 2017 the Board of Public Works opened and read quotes for the above project. <br />All quotes were found to be correct. <br />The quotes ranked as follows: <br />Bidder <br />Amount <br />TX Concrete <br />$ 8,545.13 <br />Willis Construction <br />$ 10,469.00 <br />JW Concrete and Excavating <br />$ 12,755.00 <br />Errors were found in two separate quotes: <br />1. TX Concrete filled in the total cost of each line item but did not include unit prices. Jose <br />Quijada, from TX Concrete, verbally confirmed unit prices over the phone that were <br />determined by back -calculating from the total costs and the line item quantities. The <br />quantity for concrete curb removal does not divide evenly into the total cost of the line <br />item. Therefore, a unit price was determined that increases the total cost by $0.13. This <br />increase does not impact the results of the quote. <br />2. Willis Construction made a multiplication error that, when corrected, results in an <br />increase of $69.00 to the originally reported final amount. This was communicated to <br />Willis Construction via phone. The quote tabulation reflects the corrected final amount. <br />This increase does not impact the results of the quote. <br />recommend award of the contract for Project 117-013 Fire Dept. Training Center Site <br />Improvements, to the lowest responsive/responsible bidder, TX Concrete in the amount of <br />8 545.13. <br />The funds have been appropriated through the Repairs and Maintenance account, funding <br />number 101-0901-422.36-01. <br />Please call if you have any questions. <br />Enclosure: Bid Tabulation <br />Page I of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.