Laserfiche WebLink
i m <br />appropriate Performance and design criteria 1113t such 1,"vices must statsfy.'I'llc: Architect shall review shop <br />Drawings and other submittals related ur the Wort: designed or certified by the design prol'essional rolainCd by the• <br />C`nntractur that bear such professi€.)nal's -cal and sfgrialtue when submitted to tie Architect. The Archilect shall be <br />entitled to rely upon the adequacy, accuracy and cumplemless ol, the services, cerlifienlion.s and app€-ovals <br />performed or provided by such design professionals. <br />§ 3.4.4.3 The Architect shrill review and respond to written requests for irllClrillalioll about rile 0111tract f)ocuillcI11S. <br />The Architect's response to such requests Shall be, mode in writing within any time limits agreed upon, or otherwise <br />with reasonable proniptness. <br />§ 3.4,5 CHANGES IN THE WORK <br />'I'hc Architect may' authorize lllirior changes in the Work that arc consislertt with the intent of rile ('ontract <br />I)ocumcnts and do not involve an adjustment in the; Contract Sum or an extension of the ('antract'l rule. Subject to <br />the provisions of Section 4.2.2. lite. Architect shall prepare Change Orders and ('or€struclion Change Dircetives 161. <br />the Owner's approval and execution in accorclattce Willi the Contract 1)ocunlewks. <br />§ 3.4.6 PROJECT COMPLETION <br />The Architect shall conduct inspections to determine the date or dates of Substantial Completion and the date of <br />fimtl completion; issue (.'ertificatcs of Substantial Completion: receive front the Cotalraciur valid forward it) the <br />()wiler, for the Owner's rovim and records, written warranties and related documents required by the ('ontract <br />Documents and assembled by the: Contractor; told issue i final Certificate for Payment base(] upon it final inspection <br />indicating Ile Work complies with the regniruments of tho Contract I)octlanews, <br />ARTICLE 4 ADDITIONAL SERVICES <br />§ 4.1 Additional Services are not included in Basic Services but play be squired for the Projcet. Such Additional <br />Scrvicus irtay include prugminming; hudget analysis, financial feasibility studies, site analysis and selection, <br />environmental studies, civil engineering, landscape design, telecoillmunicattans/data, security, measured drawings <br />of existing conditions, coordination of separate contructors or independent cot€sttftailts, coordination uf' cunstructon <br />or proj.oct managers, detailed cost estimates, on -site pro,icet representation beyond requiretnertts of Section 4.2.1, <br />value analysis, quantity surveys, illterltlr architectural desipri, planning of tenant or rental spaces, nlventortes of <br />materials or eritnpment, preparation of record drawings, Commissioning, crlvironnicntally responsible design beyond <br />Basic Services, 1,1:1i1){' Certification, fast -track design services, and any oilier' Services not otherwise included in <br />this Agreement. <br />(Insert a de.wriplion 01'eaclr Arldiflone l Ser'rice the Arrhifect shall provide, in an e-rhibil <br />allac.'hed to this elocraller11,) <br />§ 4,2 Additional Services may be provided rafter execution of this Agreement, without invalidating the Agreement. <br />LxccPt for crviccs rc€luire.d duce to the fault of the Architect, any Additional Services provided in accordance with <br />this Sec(iuu 4.2 shall entitle the Architect to compensation pursuant to Section 11.3. <br />§ 4.2.1 The /lrillitect hats included in haste Services NA ( ) site visits over the <br />duration of the. Projcel during construction. The Architect shall conduct ,cite visits in excess elf that amount as an <br />Additional Service, <br />§ 4.2.21 Ile. Architect sl€all review .lad evaluate Contractor's proposals. calnd il' ne('essary, prepare. [)ravings, <br />Spacificatiurls and other documcmalion and data, and provide any uthcr services made necessary h)l Change (}rcicrs <br />and Construction Change Directives prepared by the Archik:cl as an Additional Service. <br />§ 4.2.3 If the services covered by this Agrecincnt have not he.en completed within NA <br />( ) months of the date of this Agreeing m, through no lault of the Architect, extension of the Architeet's <br />services beyond that tittle Shull be compensated as Additional Services. <br />ARTICLE 5 OWNER'S RESPONSIBILITIES <br />§ 51 l.lnlcss otherwise provided for tinder this Agreemem, the ONVI t' shall provide information in €i timely manner <br />AIA Document 8109fa — 200'7, Copyright �T) 1974, 1478. MIT 'f's137, errd 2007 by 7 hr: Amorlean Insli-,jle o' Arrhilec;s. All rights reserved. 'F,'F; i:it>'it <br />-d Y ; u�.,r,i ' sl, .1i, I € .-,11,- F,._IP. r;rJ r"r,..,il.c ._. > t._, riL�l S,.>n of 1 II: Ai.1 <br />Ela;L vll °� ..n, �. iE. I , r a:F. r.ir : ;ri .I, '•7„I r' 04.w, ; . 1 t "I i:_ j -,�£ €€. € 1. . „u, 3r, x €, ,It.3r af# f , '!•, <br />r s, Pl.rchammz are penNaiurl to reproduce tan (tp) copies of this oocumerl whey € inploled Ta spur: copyrlgh: violations of NA Contracl Documenls, e- <br />mail The Airei oan IwAwte of Aichilncts Ingal counsel, repyrirh€@aia.org <br />