My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - DLZ Indiana - Design & Right of Way Services for Farminigton 14A Lift Station
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
PSA - DLZ Indiana - Design & Right of Way Services for Farminigton 14A Lift Station
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 9:26:01 AM
Creation date
3/31/2017 11:07:55 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
3/28/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
5.02 Designing to Construction Cost Limit <br />A. If a Construction Cost limit is established between Owner and Engineer, such Construction Cost <br />limit and a statement of Engineer's rights and responsibilities with respect thereto will be <br />specifically set forth in Exhibit F, "Construction Cost Limit," to this Agreement. <br />5.03 Opinions of Total Project Costs <br />A. The services, if any, of Engineer with respect to Total Project Costs shall be limited to assisting the <br />Owner in collating the various cost categories, which comprise Total Project Costs. Engineer <br />assumes no responsibility for the accuracy of any opinions of Total Project Costs. <br />ARTICLE 6 — GENERAL CONSIDERATIONS <br />6.01 Standards of Performance <br />A. Standard of Care: The standard of care for all professional engineering and related services <br />performed or furnished by Engineer under this Agreement will be the care and skill ordinarily used <br />by members of the subject profession practicing under similar circumstances at the same time and <br />in the same locality. Engineer makes no warranties, express, implied, under this Agreement, or <br />otherwise, in connection with Engineer's services. <br />B. Technical Accuracy: Owner shall not be responsible for discovering deficiencies in the technical <br />accuracy of Engineer's services. Engineer shall correct deficiencies in technical accuracy without <br />additional compensation, unless such corrective action is directly attributable to deficiencies in <br />Owner -furnished information. <br />C. Consultants: Engineer may employ such Consultants as Engineer deems necessary to assist in the <br />performance or furnishing of the services, subject to reasonable, timely, and substantive objections <br />by Owner. <br />D. Reliance on Others: Subject to the standard of care set forth in Paragraph 6.0l.A, Engineer and its <br />Consultants may use or rely upon design elements and information ordinarily or customarily <br />furnished by others, including, but not limited to, specialty contractors, manufacturers, suppliers, <br />and the publishers of technical standards. <br />E. Compliance with Laws and Regulations, and Policies and Procedures: <br />1. Engineer and Owner shall comply with applicable Laws and regulations. <br />2. Prior to the Effective Date, Owner provided to Engineer in writing any and all policies and <br />procedures of Owner applicable to Engineer's performance of services under this <br />Agreement. Engineer shall comply with such policies and procedures, subject to the <br />standard of care set forth in Paragraph 6.0l.A, and to the extent, compliance is not <br />inconsistent with professional practice requirements. <br />3. This Agreement is based on Laws and Regulations and Owner -provided written policies <br />and procedures as of the Effective Date. Changes after the Effective Date to these Laws <br />and Regulations, or to Owner -provided written policies and procedures, may be the basis <br />Page 4 <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society, of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.