My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - DLZ Indiana - Design & Right of Way Services for Farminigton 14A Lift Station
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
PSA - DLZ Indiana - Design & Right of Way Services for Farminigton 14A Lift Station
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 9:26:01 AM
Creation date
3/31/2017 11:07:55 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
3/28/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
be noted. Storm and sanitary sewer investigation detail sheets will be provided for <br />all structures located within the project limits. <br />b. Geotechnical Investigation <br />1) The Engineer shall make or cause to be made, a geotechnical investigation. <br />2) Prior to making the borings, the Engineer shall submit boring specifications and <br />boring locations and sketches for approval by the Owner. Borings shall extend <br />sufficiently in depth to obtain characteristic data for the proper design of the <br />pavement and sewers. The Engineer shall backfill bore hole or cause to be <br />backfilled in accordance with Aquifer Protection Guidelines, dated October 30, <br />1996. <br />3) One (1) soil boring (at a depth 30 feet) will be completed at the proposed lift station <br />location. <br />4) One (1) pavement core will be completed, on Woodhurst Road adjacent to the <br />existing Farmington 14A Lift Station. <br />5) The finalized boring logs and report will be provided for Owner review. <br />c. Lift station site plan will include an access drive and plantings for visual screening. <br />Exterior lighting and fencing will be included as requested by the Owner. <br />d. Roadway pavement replacement will be limited to the full depth pavement replacement <br />required as a result of the forcemain installation. <br />e. Bypass pumping will not require the exisiting station to remain in operation while new <br />electrical equipment is being constructed. <br />f. Develop suggested general construction sequencing parameters that will serve as a <br />guideline for the Contractor during construction. The lift station contractor will be <br />required to develop the actual construction sequence. <br />g. Provisions will be incorporated into the bid documents for relocating the existing <br />telemetry system in the existing lift station to the new lift station site once the existing <br />lift station is taken off-line. <br />h. Prepare demolition plans and specifications for the removal of a portion of the existing <br />lift station wet well, forcemain and associated components that are to be replaced. It is <br />anticipated that the existing lift station wet well will remain; selective demolition will <br />be necessary for piping, mechanical and electrical componets. <br />7. Fumish 5 review copies and one 1 digital PDF copy of the Preliminary Design Phase <br />documents and any other deliverables to Owner within 45 calendar days of notice to <br />proceed, and review them with Owner. Within 14 calendar days of receipt, Owner shall <br />submit to Engineer any comments regarding the Preliminary Design Phase documents and <br />any other deliverables. <br />Page 3 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.