My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - DLZ Indiana - Design & Right of Way Services for Farminigton 14A Lift Station
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
PSA - DLZ Indiana - Design & Right of Way Services for Farminigton 14A Lift Station
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 9:26:01 AM
Creation date
3/31/2017 11:07:55 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
3/28/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EJCDC....--- <br />ENGINEERS JOINT CONTRACT <br />DOCUMENTS COMMITTEE <br />AGREEMENT <br />BETWEEN OWNER AND ENGINEER <br />I 1 _: <br />PROFESSIONAL SERVICES <br />THIS IS AN AGREEMENT effective as of - a g , )-o (7 (`Effective Date") between <br />City of South Bend acting by and through the Board of Public Works ("Owner") and <br />DLZ Indiana, LLC, 2211 East Jefferson Blvd. South Bend, Indiana 46615 ("Engineer"). <br />Owner's Project, of which Engineer's services under this Agreement are a part, is generally identified as <br />follows: <br />FARMINGTON 14A LIFT STATION UPGRADE ("Project"). <br />Engineer's services under this Agreement are generally identified as follows: <br />The Project includes the preparation of construction documents for upgrading the existing lift station. <br />The Engineer will prepare plans to replace the existing pumps with two (2) submersible pumps with <br />variable frequency drives. In addition, a portion of the existing lift station will be demolished in order <br />to accomdate a valve vault insert. Refer to Exhibit A, Figure No.1 for the Project Limits Map. <br />The existing Farmington 14A lift station pumping capacity is 240 gallons per minute (gpm) and the <br />existing 6" cast iron forcemain is approximately 261 feet in length. The existing lift station equipment <br />will be replaced with a submersible duplex pump station. The existing vaccum-prime pumps will be <br />replaced with the submersible pumps having the same flow rate, total dynamic head and horsepower <br />design parameters as the existing pumps. The existing wetwell and forcemain are assumed to be in <br />adequate condition and to accomadate these improvements. The existing forcemain is to be maintained <br />throughout construction. The Owner acknowledges that the lift station upgrades will not require <br />upsizing as no future growth is anticipated in the surrounding area. <br />Page 1 <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Caovrieht © 2008 National Societv of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.