My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - DLZ Indiana - Design & Right of Way Services for Farminigton 14A Lift Station
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
PSA - DLZ Indiana - Design & Right of Way Services for Farminigton 14A Lift Station
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 9:26:01 AM
Creation date
3/31/2017 11:07:55 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
3/28/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Work (or a specified part thereof) can be utilized for the purposes for which it is intended. <br />The terms "substantially complete" and "substantially completed" as applied to all or part <br />of the Work refer to Substantial Completion thereof. <br />31. Supplier — A manufacturer, fabricator, supplier, distributor, material supplier, or vendor <br />having a direct contract with Contractor or with any Subcontractor to furnish materials or <br />equipment to be incorporated in the Work by Contractor or Subcontractor. <br />32. Total Project Costs — The sum of the Construction Cost, allowances for contingencies, <br />and the total costs of services of Engineer or other design professionals and consultants, <br />together with such other Project -related costs that Owner furnishes for inclusion, <br />including but not limited to cost of land, rights -of -way, compensation for damages to <br />properties, Owner's costs for legal, accounting, insurance counseling and auditing <br />services, interest and financing charges incurred in connection with the Project, and the <br />cost of other services to be provided by others to Owner pursuant to Exhibit B of this <br />Agreement. <br />33. Work — The entire construction or the various separately identifiable parts thereof required <br />to be provided under the Contract Documents. Work includes and is the result of <br />performing or providing all labor, services, and documentation necessary to produce such <br />construction, and furnishing, installing, and incorporating all materials and equipment into <br />such construction, all as required by the Contract Documents. <br />ARTICLE 8 — EXHIBITS AND SPECIAL PROVISIONS <br />8.01 Exhibits Included.• <br />A. Exhibit A, Engineer's Services. <br />B. Exhibit B, Owner's Responsibilities. <br />C. Exhibit C, Payments to Engineer for Services and Reimbursable Expenses. <br />Tl Responsibilities and Limitations of Authority of Resident D« 'ee <br />D. Exhibit D, Duties, �� �» �- <br />Repr-esemative. Not Included <br />E. Exhibit E, Notiee of Acceptability of Work Not Included <br />F. Exhibit F, c'onsti-aetian Cost T t. Not Included <br />G. Exhibit G, Insurance. <br />H. Exhibit H, Dispute Resolution; Not Included <br />I. Exhibit I, Limitations of Liability. <br />Exhibit J, Speeial�ons. Not Included <br />K. Exhibit K, Amendment to Owne~ Engineer A b ee fflem Not Included <br />Page 15 <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.