My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 12 - South Bend One Way to Two Way Conversion Division B - Rieth Riley Construction Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Change Orders
>
Change Order No 12 - South Bend One Way to Two Way Conversion Division B - Rieth Riley Construction Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 2:32:57 PM
Creation date
3/31/2017 10:53:04 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
3/28/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Change Order No. 33 <br />One- Way to Two -Way Street Conversion <br />Division B — Part 1 <br />Project No. 116-001 <br />OWNER: City of South Bend <br />ENGINEER: Jones Petrie Rafinski <br />Chris Chockley, PLA <br />Professional Landscape Architect No. 20500170 <br />CONTRACTOR: Rieth-Riley Construction <br />PROJECT: One -Way to Two -Way Street Conversion <br />Project No. 116-001 <br />SUBJECT: St. Joseph Street Irrigation System <br />ISSUE DATE: October 28, 2016 <br />This Change Order to the Contract document shall supplement, amend, and shall become a part of, <br />and be incorporated as an Addendum to the Contract. <br />The following is a summary and description of the revisions to the Contract by this Change Order: <br />1. Addition of new irrigation systems and existing irrigation system repairs along St. Joseph <br />Street, Part 1 or 3, Division B. <br />Sheet 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.