My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - 2017 Street and Sewer Dept Materials Proj No. 117-023 - Ozinga Ready Mix
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Opening of Bids
>
Opening of Bids - 2017 Street and Sewer Dept Materials Proj No. 117-023 - Ozinga Ready Mix
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 8:40:10 AM
Creation date
3/31/2017 10:31:24 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
3/28/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />BID NAME 2017 Street Materials <br />FOR BIDS DUE March 28, 2017, 9:30 a.m., Local Time <br />Item <br />No. <br />Description <br />Est. Qty. <br />Unit <br />Unit Price <br />Total <br />PART A - ASPHALT MATERIALS <br />A-1 <br />HMA Surface 11 L <br />7,500 <br />TON <br />$ <br />A-3 <br />HMA Surface 11 L MAC HD <br />3,500 <br />TON <br />$ <br />A4 <br />HMA Surface I IS <br />1,000 <br />TON <br />$ <br />A-6 <br />HMA Binder 8/9 <br />1,000 <br />TON <br />$ <br />A-7 <br />HMA Binder 11 <br />3,500 <br />TON <br />$ <br />A-8 <br />HMA Binder 11 MAC <br />3,000 <br />TON <br />$ <br />A-9 <br />HMA Base 5D <br />1.000 <br />TON <br />$ <br />A-10 <br />AE-T Tack <br />30.000 <br />GAL <br />$ <br />A-11 <br />RS-2 <br />30,000 <br />GAL <br />$ <br />A-13 <br />MAC 20 Crack Seal <br />2,500 <br />GAL <br />$ <br />A-14 <br />CMA Patch AE-300 HP <br />500 <br />TON <br />$ <br />Part A Total <br />$ <br />PART B — PCC MATERIALS <br />B-1 <br />Class A Concrete <br />1,800 <br />CY <br />98.00 <br />$ 176 400 <br />B-2 <br />Class A High Early <br />600 <br />CY <br />105.50 <br />$ 63,300 <br />B-3 <br />High Early Concrete w/Integral Color- <br />Black <br />150 <br />CY <br />190.00 <br />$ 28,500 <br />B-4 <br />Flowable Fill, Removable <br />300 <br />CY <br />65.00 <br />$ 19,500 <br />B 9 <br />Non -Chloride Accelerator added to <br />concrete — 0.5% <br />250 <br />EACH CY <br />2.50 <br />$ 625 <br />B-10 <br />Non -Chloride Accelerator added to <br />concrete — 1% <br />750 <br />EACH CY <br />5.00 <br />$ 3,750 <br />B-11 <br />Non -Chloride Accelerator added to <br />concrete — 2 /° <br />500 <br />EACH CY <br />10.00 <br />$ 5,000 <br />Part B Total <br />$297,075 <br />PART C — AGGREGATE MATERIALS <br />C-1 <br />No. 23 Sand <br />5.000 <br />TON <br />$ <br />C-2 <br />No. 53 Gravel <br />1,000 <br />TON <br />$ <br />C-3 <br />No. 53 Recycled Concrete <br />4,000 <br />TON <br />$ <br />C-4 <br />No. 53 Slag <br />1,000 <br />TON <br />$ <br />C-5 <br />Topsoil <br />100 <br />CY <br />$ <br />C-7 <br />No. 11 Slag Chip Stone <br />800 <br />TON <br />$ <br />Part C Total <br />$ <br />Yer. 13 — 6/01/1 S <br />
The URL can be used to link to this page
Your browser does not support the video tag.