Laserfiche WebLink
TRAFFIC ENGINEER (TRAFFIC SIGN INSTALLATIONS) <br />The Board approved the following installations: <br />Stop sign installed on Vine Street, southwest corner at 23rd St. <br />Yield Right -of -Way sign installed on Vine Street, northeast <br />corner at 23rd St. <br />Stop Sign installed on Harbor Avenue, northwest corner, at Corby St. <br />Stop Sign installed on Oak Park Drive, northeast corner, at Black Oak Dr. <br />Yiekd Right of Way sign installed on 0ak Park Dri., southwest <br />corner, at Black Oak Dr. <br />Yiekd Right -of -Way sign on Coquillard Drive northwest corner at <br />Bader St. <br />Stop Sign installed on Coquillard Drive, southeast corner at Bader St. <br />Stop Sign installed on Bader St., southwest corner, at Ironwood <br />Stop Sign installed on Cedar St., southwest corner, at Ironwood <br />Yield Right -of -Way sign installed on Congress, southeast corner, <br />at MacArthur <br />Stop Sign installed on Union St., northeast corner, at Ironwood Drive. <br />Stop Sign installed on Solomon St., northeast corner, at Ironwood <br />Yield Right -of -Way sign installed on Dorwood, southwest corner, at <br />Ironwood <br />Stop Sign installed on Oak Park Drive, southwest corner, at Ironwood <br />Drive <br />There being no further business to come before the Board, the meeting was <br />adjourned at 11:00 A.M. <br />Chairman <br />Attest: Antho J. Sabo, Clerk <br />r.. <br />