My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/05/61 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1961
>
06/05/61 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 2:56:15 PM
Creation date
3/23/2017 9:51:04 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
6/5/1961
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
317 <br />June 5, 1961 <br />A regular meeting of the Board of Public Safety was held on Monday, <br />June 5, 1961 at 10:00 A.M. DST. All members were present. Minutes <br />of the last regular meeting were read and approved. Vouchers were <br />approved and ordered paid to the various suppliers. <br />_OPENING OF BIDS - FIRE STATION NO.13 <br />The time now being after 10:00 A.M. it was so announced and bids for the <br />remodeling of Fire Station No. 13 were opened and read aloud. Proofs of <br />publication were found sufficient. The following bids were received: <br />GENERAL CONSTRUCTION <br />Harry H. Verkler. Contractor, Inc. <br />645 N. Wilber St. <br />South Bend, Indiana <br />Remodeling and Addition to Fire Station #13 $39p145.00 <br />Alternate No. 1 Blacktop in liew of Concrete No change <br />it " No. 2 Omit Mortar Coloring No change <br />" " No. 3 Rock Lath in liew of metal lath Deduct $517.00 <br />No. 4 Dry Wall Construction Deduct $765.00 <br />" No. 5 Eliminate Marble Sills No change <br />D <br />No. 6 Eliminate Door Closers Deduct $115.00 <br />No. 7 Metal Toilet Stalls in liew of Marble Deduct $466.00 <br />No. 8 Elminate painting of side walls <br />& ceiling Deduct $492.00 <br />Work to be completed in approximately ninety working days <br />Bid Bond, signed by Harry Verkler for 5% of Bid <br />Non -Collusion Affidavit, signed by Harry Verkler <br />Standard Questionnaires and Financial Statement <br />Taylor Construction Co.. Inc. <br />520 E. Sample St. <br />South Bend, Ind. <br />General Construction Work for Remodel and Addition <br />to Fire Station <br />#13 <br />$43,905.00 <br />Alternate <br />No. <br />D <br />Deduct for deleting mortar color <br />Deduct <br />$127.00 <br />" "..No: <br />2 <br />To <br />use Blacktop Driveway in lieu <br />of Concrete <br />Add <br />$505.00 <br />No. <br />3 <br />To <br />substitute Rock Lath in lieu <br />of Metal Lath <br />Deduct <br />$517.00 <br />" <br />No. <br />4 <br />To <br />use Drywall construction in <br />lieu of Lath and Plaster <br />Deduct <br />$730.00 <br />No. <br />5 <br />To <br />use Brick sills in lieu <br />of Marble Sills <br />Add <br />$16.00 <br />No. <br />6 <br />To <br />delete interior painting <br />Deduct <br />$487.00 <br />Bid Bond for 5% of Bid, signed by Paul Roelke,Secy.Treas. <br />Non -Collusion Affidavit, signed by Paul Roelke, Secy.-Treas. <br />Standard Questionnaires and Financial Statement <br />Muia Construction Co.. Inc. <br />1818.S. Main St. <br />South Bend, Ind. <br />This bid was rejected for reason that it was incomplete. Bid was returned <br />to Muia Construction Co., Inc. <br />Carl J..Reinke & Sons. Inc. <br />1522 W. Ford St. <br />South Bend 19, Ind. <br />General Construction work for remodeling and addition to #13 Fire <br />Station, City <br />of <br />South Bend <br />$40,718.00 <br />Alternate No. <br />1 <br />Eliminate mortar color <br />Deduct $120.00 <br />" No. <br />2 <br />Plastering, rock lath in liew od <br />metal lath <br />Deduct $517.00 <br />" No. <br />3 <br />Dry wall construction in lieu of <br />Lath and Plaster <br />Deduct $700.00 <br />" " No. <br />4 <br />Eliminate Marble Window Stools, <br />Beduct $15.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.