My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - M E Design Services - Design & Construction oversight for replacement of Century Center cooling tower
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
PSA - M E Design Services - Design & Construction oversight for replacement of Century Center cooling tower
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 9:44:07 AM
Creation date
3/16/2017 10:11:04 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
3/14/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EJCDC§g <br />ENGINEERS JOINT CONTRACT <br />DOCUMENTS COMMITTEE <br />AGREEMENT <br />BETWEEN OWNER AND ENGINEER <br />FOR <br />PROFESSIONAL SERVICES <br />THIS IS AN AGREEMENT effective as of March 14, 2017 ("Effective Date") between <br />Board of Public Works, City of South Bend, Indiana acting on behalf of the Department of Parks and <br />Recreation, City of South Bend, Indiana ("Owner") and <br />Thomas R. Cook, dba M/E Design Services ("Engineer"). <br />Owner's Project, of which Engineer's services under this Agreement are a part, is generally identified as <br />follows: <br />Century Center Cooling Tower Replacement, Project No. 117-035 ("Project"). <br />Engineer's Services under this Agreement are generally identified as follows: <br />This project will involve replacement of the existingcooling ooling tower with a similarly configured tower of the <br />same capacity. Tower controls were recentlyuupdcted under a separate project. Reconnection and re- <br />programming of tower controls will be carried out by the Contractor that completed that control project <br />(Ameresco). M/E Design Services and Century Center personnel will coordinate with Ameresco as <br />necessary. Note that, due to the long lead-time for the cooling tower delivery, there will be extended <br />periods of time where no active construction work is taking place. M/E Design Services will only provide <br />construction observation during periods of active on -site construction. <br />Owner and Engineer further agree as follows: <br />1.01 Basic Agreement and Period of Service <br />A. Engineer shall provide, or cause to be provided, the services set forth in this Agreement. If <br />authorized by Owner, or if required because of changes in the Project, Engineer shall furnish <br />services in addition to those set forth above. Owner shall pay Engineer for its services as set forth in <br />Paragraphs 7.01 and 7.02. <br />Engineer shall complete its services within a reasonable time, or within the following specific time <br />period: Drawings and Specifications to be provided within Forty (40) days after notice to proceed. <br />Page 1 <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright 0 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.