My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - EPOCH Architecture + Planning LLC - Design of Masonry Restoration on Century Center
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
PSA - EPOCH Architecture + Planning LLC - Design of Masonry Restoration on Century Center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 9:38:45 AM
Creation date
3/16/2017 10:10:16 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
3/14/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SUGGESTED FORMAT <br />(for use with E-500, 2008 Edition) <br />This is EXHIBIT C, consisting of 4 pages, referred to <br />in and part of the Agreement between Owner and <br />Engineer for Professional Services dated March 14, 2017 <br />Payments to Engineer for Services and Reimbursable Expenses <br />COMPENSATION PACKET BC-1: Basic Services — Lump Sum <br />Article 2 of the Agreement is supplemented to include the following agreement of the parties: <br />ARTICLE 2 — OWNER'S RESPONSIBILITIES <br />C2.01 Compensation for Basic Services (other than Resident Project Representative) —Lump Sum Method <br />of Payment <br />A. Owner shall pay Engineer for Basic Services set forth in Exhibit A, except for services of <br />Engineer's Resident Project Representative, if any, as follows: <br />1. A Lump Sum amount of $14 760 based on the following estimated distribution of <br />compensation: <br />a. Study and Report Phase $ <br />b. Preliminary Design Phase $ <br />c. Final Design Phase $12,360 <br />d. Bidding and Negotiating Phase $ <br />e. Construction Phase $2,400 <br />f. Post -Construction Phase $ <br />2. Engineer may alter the distribution of compensation between individual phases noted herein <br />to be consistent with services actually rendered, but shall not exceed the total Lump Sum <br />amount unless approved in writing by the Owner. <br />3. The Lump Sum includes compensation for Engineer's services and services of Engineer's <br />Consultants, if any. Appropriate amounts have been incorporated in the Lump Sum to <br />account for labor, overhead, profit, and Reimbursable Expenses. <br />4. The portion of the Lump Sum amount billed for Engineer's services will be based upon <br />Engineer's estimate of the percentage of the total services actually completed during the <br />billing period. <br />Paget <br />Exhibit C -Compensation Packet BC-1: Basic Services (other than RPR) - L ump Sum Method of Payment <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.