Laserfiche WebLink
a) Cylinders (except DOT 3E 1800) and ton containers must be retested at least <br />once in fine years (DOT'Section 173.34e and Section 173.31d). <br />b) Cylinders cannot he filled until they are retested after the fire year anniversary <br />of the month in which it ivas tested Ton containers can be filled until the end of <br />the calendar year during imhich their fire year test is due. <br />c) Retests are also required after any reheat treahnent. In addition, retest any <br />container which shows evidence of weakness at any time, or shoii� a 5 percent or <br />more loss in weight. <br />2. "rest Procedure <br />a) Cylinders and ton containers are hydrostatically retested by the hydrostatic <br />expansion method [DOT Section 1 73. 34 (a) and Section 173.31 (d)J. If at the <br />time of requalifrcation a container shows a leak or a permanent expansion ro,hich <br />exceeds 10% of the total expansion, it must be condemned. <br />3. Container Records <br />a) Records must be kept showing results of the test. Each container must have the <br />test date plainly and permanently stanvped into the petal of one head or the <br />chime of each task passing the hydrostatic retest. <br />G. CONDITIONS OF DELIVERY <br />A South Bend Water Works representative shall specify the location for <br />chlorine cylinder and ton container deliveries. <br />2. Delivery Locations: <br />Location <br />Type of Container <br />Address <br />North Station <br />2,000 lb. Ton Container <br />830 North Michigan Street <br />Carriage Hills <br />150 lb. Cylinder <br />52290 Shenandoah Drive <br />Erskine <br />150 lb. Cylinder <br />4116 South Fellows Street <br />South <br />1,250 lb. Ton Container <br />3600 South Main Street <br />Cleveland South <br />150 lb. Cylinder <br />4900 Cleveland Road <br />Cleveland North <br />150 lb, Cylinder <br />4949 Cleveland Road <br />Waste Water <br />2,000 lb. Ton Container <br />3113 Riverside Drive <br />3. Vendor personnel shall conduct all activities related to the loading and <br />unloading of cylinders. <br />4. Ton containers will need to be delivered with a cherry picker. <br />5. Minimum deliveries are two (2) ton containers and twelve cylinders. <br />6. Supplier must be able to guarantee delivery within five (5) calendar days alter <br />order placement <br />7. Vendor personnel shall not unload any filled cylinders or ton containers prior <br />to live inspection by South Bend Water Works Personnel. <br />8. Vendor personnel shall assist South Bend personnel in the visual inspection of <br />each cylinder or ton container for: <br />