My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Water Treatment Chemicals 2017-2018 - Pencco, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Opening of Bids
>
Opening of Bids - Water Treatment Chemicals 2017-2018 - Pencco, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 12:19:50 PM
Creation date
3/15/2017 2:40:09 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
3/14/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
VI1. SULFUR DIOXIDE <br />A. PROPERTIES <br />Boiling Point <br />-10°C <br />Color <br />Colorless <br />Specific Gravity <br />(80°F <br />1.363 <br />Critical Temp. <br />314.82°F <br />Critical Pressure <br />1141.5 PSIA <br />B. USAGE <br />1. Estimated annual usage is 100 tons, more or less, to be delivered in 2,000 lb <br />containers of liquid S02 in truckload lots of 10 containers. <br />C. DELIVERY <br />1. Supplier must be able to guarantee delivery of 10 tons (20,000 lbs) within five <br />(5) calendar days from release of requirement. <br />2. Material to be delivered F.O.B. <br />3. No freight surcharges allowed. <br />4. Billing must be submitted on a CWT unit basis. <br />S. Delivery Location: Waste Water Treatment Plant located at 3113 Riverside <br />Drive, South Bend, Indiana 46628. <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.