My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Leeper Park Tennis Court Recoloring 2017 - Asphalt Restoration Services, LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Opening of Bids
>
Opening of Bids - Leeper Park Tennis Court Recoloring 2017 - Asphalt Restoration Services, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 9:39:15 AM
Creation date
3/15/2017 2:12:56 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
3/14/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Once the cracks have completely dried, we will scrape the entire surface to ensure <br />proper smoothness. One coat of resurfacer will then be applied to 3-¢ courts at a time, <br />allowing proper cure time in between courts. Next, the courts will be scraped again <br />and blown to remove any debris. Two coats of the Color Plus top coat will be applied. <br />Again, surface will be scraped and blown to remove any debris before applying the next <br />coat. At this time, the day time temperature should be around 65-7o degrees <br />Fahrenheit and not lower that 55 degrees Fahrenheit at night. One day per court for <br />color paint application. Two coats of Tenni urt white line paint will be applied <br />following regulation layout. Two coats of blue f Quick Start. q Courts per day. <br />a. We have never used any subcontractors on a Public Works project. <br />3. We will not sublet any portion of the proposed work in this contract. <br />q. Equipment available for this project: <br />Line taping machine, Bobcat, power washer, split trailer (for mixing paints) as well <br />as multiple buckets and tools required for preparing the paints. Scraping tools, <br />brushes and tarps. <br />5. We have not entered into any contracts or received any offers for materials to be used <br />on this proposed project. Our price is a reflection of what our company requires to <br />perform the work while remaining profitable. We have come to this price after <br />consideration of our operating costs from the past years. This includes equipment, <br />labor, materials and all necessary insurance policies and bonds that are required for our <br />company to successfully operate. <br />SECTION III FINANCIAL STATEMENT <br />Please find our financial statement enclosed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.