Laserfiche WebLink
IM.E. Simpson Co., Inc. I Large Water Meter Test and Repair Program Page 13 <br />Village of Westmont, Illinois (1986-2016) <br />M.E. Simpson Co., Inc. performs a Large Meter Testing Program each year for the Village of Westmont, <br />Illinois. A number of large meters are tested and evaluated for sizing, application and accuracy. All field <br />data is gathered and entered into a meter database and a report written documenting the accuracy of <br />each meter prior to repair. The meters are categorized by type and size. An individual report of each <br />meter test was made with the test results and repair comments. This was done so that the Utility staff <br />could easily use the information to observe the recovery of lost revenue from the meter. This project is <br />part of an ongoing effort to reduce revenue loss in the water system. <br />Contracted amount: <br />Time required to complete the project: <br />Findings of the project: <br />Projected annualized cost saving to the <br />Utility authorizing the project: _ <br />Contact: <br />$14,000.00 <br />3 weeks <br />Ongoing meter testing helped find inaccurate meters <br />$14,000.00 <br />-------------- <br />Mr. Jim Cates <br />Water Division Superintendent <br />Village of Westmont <br />39 E. Burlington <br />Village of Westmont, IL 60559-1790 <br />630.829.4479 <br />City of Mishawaka, Indiana (1986-2016) <br />M.E. Simpson Co., Inc. performs a Large Meter Testing Program each year for the City of Mishawaka, <br />IIndiana. A number of large meters are tested and evaluated for sizing, application and accuracy. All field <br />' data is gathered and entered into a meter database and a report written documenting the accuracy of <br />each meter prior to repair. The meters are categorized by type and size. An individual report of each <br />meter test was made with the test results and repair comments. This was done so that the Utility staff <br />could easily use the information to observe the recovery of lost revenue from the meter. This project is <br />part of an ongoing annual effort to reduce revenue loss in the water system. <br />I <br />Contracted amount: $18,000.00 <br />I Time required to complete the project: 3 weeks <br />Findings of the project: 14% failure rate <br />Projected annualized cost saving to the $18,000.00 <br />Utility authorizing the project: <br />Contact: Mr. Brian Galleti <br />Meter Supervisor <br />Mishawaka Water Works <br />126 North Church Street <br />P.O. Box 363 <br />Mishawaka, IN 46546-0363 <br />574.258.1653 <br />Dates of Service: 1986-2013 <br />