My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - DLZ Indiana - Cemetery Entrance, Colfax St. Two Way Conversion, Improvements to Elm St and LaSalle St
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
PSA - DLZ Indiana - Cemetery Entrance, Colfax St. Two Way Conversion, Improvements to Elm St and LaSalle St
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 9:25:23 AM
Creation date
3/2/2017 1:36:08 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
2/28/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This is Appendix 1 to EXHIBIT C, consisting of 2 pages, <br />referred to in and part of the Agreement between Owner <br />and Engineer for Professional Services dated Februa <br />28, 2017. <br />Standard Hourlv Rates Schedule <br />A. Standard Hourly Rates: <br />1. Standard Hourly Rates are set forth in this Appendix 2 to this Exhibit C and include salaries <br />and wages paid to personnel in each billing class plus the cost of customary and statutory <br />benefits, general and administrative overhead, non -project operating costs, and operating <br />margin or profit. <br />2. The Standard Hourly Rates apply only as specified in Article C2. <br />B. Schedule: <br />Hourly rates for services performed on or after the date of the Agreement are: <br />DLZ INDIANA, LLC - STANDARD FEE STRUCTURE 2017 <br />ENGINEERING/ARCHITECTURAL <br />Activity Code <br />Employee Classification <br />2017 <br />Hourly <br />Rate <br />1 <br />Notes to User Principal <br />$220.00 <br />49/49D <br />Division Manager/Director <br />$205.00 <br />50 <br />Department Manager <br />$185.00 <br />55/4 <br />Registered Land Surveyor/Survey Coordinator <br />$135.00 <br />80/217 <br />Senior Project Manager / Project Manager II <br />$185.00 <br />21/216 <br />Project Manager <br />$170.00 <br />341/340/556/557 <br />Electrical/Mechanical/Stfuctural Engineer VI <br />$170.00 <br />555/565/214 <br />Engineer V/Architect V/Landscape Arch. V/Planner V/Scientist V/Geologist <br />V / Surveyor V <br />$165.00 <br />554/564 <br />Engineer IV/Architect IV/Landscape Architect IV/Planner IV/Scientist <br />IV/Geologist IV <br />$160.00 <br />53/58 <br />Engineer III/Architect M/Landscape Architect III/Planner III/Scientist <br />III/Geologist III <br />$140.00 <br />52/57 <br />Notes to User Engineer II/Architect II/Landscape Architect II/Planner <br />It/Scientist II/Geologist II <br />$130.00 <br />51/56 <br />Engineer I/Architect I/Landsca e Architect I/Planner I/Scientist I/Geologist I <br />$105.00 <br />28 <br />Notes to User Designer I <br />$95.00 <br />472 <br />Notes to User Designer II <br />$110.00 <br />473 <br />Notes to User Designer III <br />$125.00 <br />Exhibit C — Appendix 1: Standard Hourly Rates Schedule <br />EJCnC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright (?D 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.