Laserfiche WebLink
L. While at the Site, Engineer's employees and representatives shall comply with the specific <br />applicable requirements of Contractor's and Owner's safety programs of which Engineer has been <br />informed in writing. <br />6.02 Design Without Construction Phase Services <br />A. Engineer shall be responsible only for those Construction Phase services expressly required of <br />Engineer in Exhibit A, Paragraph A1.06. With the exception of such expressly required <br />services, Engineer shall have no design, Shop Drawing review, or other obligations during <br />construction and Owner assumes all responsibility for the application and interpretation of the <br />Contract Documents, review and response to Contractor claims, contract administration, <br />processing Change Orders, revisions to the Contract Documents during construction, construction <br />surety bonding and insurance requirements, construction observation and review, review of <br />payment applications, and all other necessary Construction Phase engineering and professional <br />services. Owner waives all claims against the Engineer that may be connected in any way to <br />Construction Phase engineering or professional services except for those services that are <br />expressly required of Engineer in Exhibit A, Paragraph A1.06. <br />6.03 Use of Documents <br />A. The Owner acknowledges the Engineer's construction documents, including all electronic <br />files, as instruments of professional services. Nevertheless, the final construction documents, <br />including all electronic files, prepared under this agreement shall become the property of the <br />Owner upon completion of services and payment in full of all monies due to the Engineer. <br />The Owner shall not reuse or make any modification to the construction documents without <br />the prior written authorization of the Engineer. All Documents are instruments of service in <br />f-espeet to this Projeet, and Engineer shall retain an ownership and property interest the <br />Owner shall not rely in any way on any Document unless it is in printed <br />form, signed or sealed by the Engineer or one of its Consultants. <br />B. Either party to this Agreement may rely that data or information set forth on paper (also known as <br />hard copies) that the party receives from the other party by mail, hand delivery, or facsimile, are <br />the items that the other party intended to send. Files in electronic media format of text, data, <br />graphics, or other types that are furnished by one party to the other are furnished only for <br />convenience, not reliance by the receiving party. Any conclusion or information obtained or <br />derived from such electronic files will be at the user's sole risk. If there is a discrepancy between <br />the electronic files and the hard copies, the hard copies govern. <br />eleetranie transmittal preeedures, such are set forth in Exhibit T <br />C. Because data stored in electronic media format can deteriorate or be modified inadvertently or <br />otherwise without authorization of the data's creator, the party receiving electronic files agrees that <br />it will perform acceptance tests or procedures within 60 days, after which the receiving party shall <br />be deemed to have accepted the data thus transferred. Any transmittal errors detected within the <br />60-day acceptance period will be corrected by the party delivering the electronic files. <br />D. When transferring documents in electronic media format, the transferring party makes no <br />representations as to long-term compatibility, usability, or readability of such documents resulting <br />Page 6 <br />EJCDC E-500 Agreement Between owner and Engineer for Professional Services <br />Convrieht c0 2008 National Societe, of Professional Engineers for EJCDC. All rights reserved. <br />