Laserfiche WebLink
Change Order No. 39 <br />One- Way to Two -Way Street Conversion <br />Division B <br />Project No. 116-001 <br />OWNER: City of South Bend <br />ENGINEER: Lochmueller Group, Inc. <br />Myron Cohagan <br />CONTRACTOR: Rieth-Riley Construction <br />PROJECT: South Bend One -Way to Two -Way Conversion Division A <br />Project No. 116-001 <br />SUBJECT: Under Bridge Lighting Fixtures. <br />ISSUE DATE: December 2, 2016 <br />This Change Order to the Contract document shall supplement, amend, and shall become a <br />part of, and be incorporated as an Addendum to the Contract. <br />The following is a summary and description of the revisions to the Contract by this Change <br />Order: <br />1. Two new, pay items are being created to replace the existing light fixtures under the <br />Main Street underpass and the Michigan street Underpass <br />The following sections of the Contract Documents are revised as a result of the above changes: <br />BIDDING AND CONTRACT REQUIREMENTS: <br />1. Bid/Proposal Form: <br />Division B: <br />Add EWA Line Item No. 480: Underpass Fixtures Bronson/Michigan Street 25 EA @ <br />$722.13 for a total of $18,053.25 <br />Add EWA line Item No. 481: Underpass Fixtures Bronson/Main Street.14 EA @ <br />$722.13 for a total addition of $10,109.82 <br />Cut sheets are attached to the change order. <br />DRAWINGS: <br />None <br />Sheet 1 of 3 <br />