Laserfiche WebLink
Change Order No. 41 <br />One- Way to Two -Way Street Conversion <br />Division B <br />Project No. 116-001 <br />OWNER: City of South Bend <br />ENGINEER: Lochmueller Group, Inc. <br />Myron Cohagan <br />CONTRACTOR: Rieth-Riley Construction <br />PROJECT: South Bend One -Way to Two -Way Conversion Division A <br />Project No. 116-001 <br />SUBJECT: Saigon Asphalt. <br />ISSUE DATE: February 2, 2017 <br />This Change Order to the Contract document shall supplement, amend, and shall become a <br />part of, and be incorporated as an Addendum to the Contract. <br />The following is a summary and description of the revisions to the Contract by this Change <br />Order: <br />A new contract line item is being generated to pay for the asphalt placed in the <br />Saigon Parking lot. This asphalt was placed to allow for trash trucks to access the <br />dumpster through the new drive across the parking lot. <br />The following sections of the Contract Documents are revised as a result of the above changes: <br />BIDDING AND CONTRACT REQUIREMENTS: <br />1. Bid/Proposal Form: <br />Division B: <br />Add EWA Line Item No. 482: HMA Patching Type B (Saigon Parking Lot) 39.76 ton @ <br />$125.00 for a total of $4,970.00 <br />SPECIFICATIONS: <br />Cut sheets are attached to the change order. <br />DRAWINGS: <br />None <br />END OF CHANGE ORDER NO. 41 <br />Sheet 1 of 2 <br />