My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - American Structurepoint - Leeper Park CSO Tank Design
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
PSA - American Structurepoint - Leeper Park CSO Tank Design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 9:21:36 AM
Creation date
2/17/2017 9:37:56 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
2/14/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AGREEMENT FOR PROFESSIONAL SERVICES <br />BY AND BETWEEN THE CITY OF SOUTH BEND, INDIANA <br />AND AMERICAN STRUCTUREPOINT, INC. of South Bend, Indiana <br />THIS AGREEMENT is made effective the 14th day of February, 2017 by and <br />between the City of South Bend, Indiana, a municipal corporation organized and operating under <br />the laws of the State of Indiana, acting by and through its Board Department of Administration <br />and Finance ("City") and American Structurepoint, Inc. ("Engineer"). <br />RECITALS <br />WHEREAS, Engineer has experience and expertise in designing combined sewage <br />storage (CSO) tanks that are required by the City in its CSO Long-term control plan; and <br />WHEREAS, the City desires to retain the services of Engineer under contract to <br />commence the design of the facility as described in Exhibit A to meet the requirements of the <br />City's CSO long-term control plan, specifically by undertaking an initial project seeping exercise <br />for the Leeper Park CSO storage tank as detailed in Exhibit A; and complete the design and <br />construction administration of such tank project, if authorized. <br />WHEREAS, the City has determined that due to Engineer's experience and expertise, it <br />is in the best interests of the City to retain Engineer's services under the terms and conditions set <br />forth in this Agreement; and <br />WHEREAS, both parties understand that this contract is for, and limited to, the initial <br />design stages as described in Exhibit A only, and this contract does not guarantee that the City <br />will continue to use the services of the engineer beyond the tasks described in Exhibit A. Also <br />both parties agree that by undertaking this contract the Engineer is not prohibited in any way <br />from proposing on future work on this same CSO long-term control plan project, Leeper Park <br />tank. <br />NOW THEREFORE, for and in consideration of the mutual covenants and promises <br />contained herein, the City and Engineer hereby agree as follows: <br />Section 1. Duties of the Engineer. The Engineer shall provide the Services which <br />are more particularly described at Exhibit "A" attached hereto and incorporated herein. The <br />Engineer shall execute its responsibilities by following and applying at all times the industry <br />standard professional and technical guidelines and standards. <br />Section 2. Consideration. The Engineer will be paid as set forth at Exhibit 'A ". The <br />total consideration under this Agreement shall be lump -sum and not exceed the sum of Forty <br />Eight Thousand Eight Hundred and Sixty Dollars ($48,860). Any payment that the City may <br />deny or withhold or delay shall not be subject to penalty or interest under Indiana Code § 5-17- <br />5.X <br />
The URL can be used to link to this page
Your browser does not support the video tag.