My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PCA - Martin Luther King Jr Center HVAC Revisions Proj No 116-064 - Hermann & Goetz Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Project Completion Affidavits
>
PCA - Martin Luther King Jr Center HVAC Revisions Proj No 116-064 - Hermann & Goetz Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 2:50:06 PM
Creation date
2/16/2017 1:36:30 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
2/14/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
WRA1T <br />Document G706ATM -1994 <br />Contractor's Affidavit of Release of Liens <br />PROJECT: (Name and address) ARCHITECT'S PROJECT NUMBER: 116-064 OWNER ❑ <br />Martin Luther Ring Jr. Center <br />CONTRACT FOR: HVAC Revisions ARCHITECT ❑ <br />CONTRACTOR ❑ <br />TO OWNER: (Name and address) CONTRACT DATED: September 13, 2016 SURETY ❑ <br />City of South Bend <br />227 W/ tIefferson Blvd. <br />South Bend, IN 46601 <br />STATE OF: Indiana <br />OTHER ❑ <br />COUNTY OF:St. Joseph <br />The undersigned hereby certifies that to the best of the undersigned's knowledge, information and belief, except as <br />listed below, the Releases or Waivers of Lien attached hereto include the Contractor, all Subcontractors, all suppliers <br />of materials and equipment, and all performers of Work, labor or services who have or may have liens or <br />encumbrances or the right to assert liens or encumbrances against any property of the Owner arising in any manner <br />out of the performance of the Contact referenced above. <br />EXCEPTIONS: <br />NONE <br />SUPPORTING DOCUMENTS ATTACHED HERETO: <br />1. Contractor's Release or Waiver of Liens, <br />conditional upon receipt of final payment. <br />2. Separate Releases or Waivers of Liens from <br />Subcontractors and material and equipment <br />suppliers, to the extent required by the Owner, <br />accompanied by a list thereof. <br />CONTRACTOR: (Name and address) <br />Herrman & Goetz Inc. <br />225 S. Lafayette Blvd. <br />South Bend, 46601 <br />BY: <br />(,5fgnat'761audjorrzed representative) <br />Larry Cripe, Power—of^Attorney <br />(Printed name and title) <br />Subscribed and sworn to before me on this date: <br />January 16, 2017 /j 1 <br />Notary Public: �` SL/+u/"'-- <br />11 <br />Catherine . GruberU <br />My Commission Expires: <br />7/13/2022 <br />CAUTION: You should sign an original AIA Contract Document, on which this text appears in RED. An original assures that <br />changes will not be obscured. <br />AIA Document G706ATe —1994. Copyright ®1970 and 1994 by The American Institute of Architects. All rights reserved. WARNING: This AIAe <br />Document Is protected by U.S. Copyright Lew and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, <br />or any portion of It, may result In severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law <br />Purchasers are permitted to reproduce ten (10) copies of this document when completed. To report copyright violations of AIA Contract Documents, <br />e-mail The American Institute of Architects' legal counsel, copyright@ala.org. <br />
The URL can be used to link to this page
Your browser does not support the video tag.