Laserfiche WebLink
City of South Bend Project No. 115-124 <br />OWNER: City of South Bend <br />ENGINEER: City of South Bend Engineering <br />Kara M. Boyles, P.E. <br />Professional Engineer No. 10809510 <br />CONTRACTOR: Michiana Contracting, Inc. <br />PROJECT: Olive Lighting over the Indiana Toll Road <br />Project No. 115-124 <br />SUBJECT: Change Order Explanation <br />ISSUE DATE: January 2, 2017 <br />Change Order No. 1 — 2/9/17 <br />This Change Order to the Contract document shall supplement, amend, and shall become a <br />part of, and be incorporated as an Addendum to the Contract. <br />The following is a summary and description of the revisions to the Contract by this Change <br />Order: <br />Item Qt— Unit Price Total <br />1. Increase Wire 868 LFT $4.75 $4,119.00 <br />1.Increase Wire <br />Additional wiring was needed to make proper connections within the new Tesco cabinet <br />and within the hand holes at the existing fixtures. <br />