My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 1 - Olive Road Lighting Over the Indiana Toll Road Proj No 115-124 - Michiana Contracting
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Change Orders
>
Change Order No. 1 - Olive Road Lighting Over the Indiana Toll Road Proj No 115-124 - Michiana Contracting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 2:53:43 PM
Creation date
2/16/2017 1:19:36 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
2/14/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of South Bend Project No. 115-124 <br />OWNER: City of South Bend <br />ENGINEER: City of South Bend Engineering <br />Kara M. Boyles, P.E. <br />Professional Engineer No. 10809510 <br />CONTRACTOR: Michiana Contracting, Inc. <br />PROJECT: Olive Lighting over the Indiana Toll Road <br />Project No. 115-124 <br />SUBJECT: Change Order Explanation <br />ISSUE DATE: January 2, 2017 <br />Change Order No. 1 — 2/9/17 <br />This Change Order to the Contract document shall supplement, amend, and shall become a <br />part of, and be incorporated as an Addendum to the Contract. <br />The following is a summary and description of the revisions to the Contract by this Change <br />Order: <br />Item Qt— Unit Price Total <br />1. Increase Wire 868 LFT $4.75 $4,119.00 <br />1.Increase Wire <br />Additional wiring was needed to make proper connections within the new Tesco cabinet <br />and within the hand holes at the existing fixtures. <br />
The URL can be used to link to this page
Your browser does not support the video tag.