My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - One or More 2017 or Newer Single Axle Lightning Loader Spec B - Pyramid Equipment Inc Part 1
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Opening of Bids
>
Opening of Bids - One or More 2017 or Newer Single Axle Lightning Loader Spec B - Pyramid Equipment Inc Part 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 10:07:42 AM
Creation date
1/12/2017 8:47:42 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
1/10/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Prepared for: <br />Prepared by: <br />Jeff Hudak <br />Dustin Waters <br />City of South Bend Board of <br />- TRUCK CITY OF GARY, INC. <br />Public Works <br />2333 W 25th Ave <br />227 W Jefferson Blvd <br />GARY, IN 46404 <br />1316 Cnty Cty <br />Phone: 219-949-8595 <br />South Bend, IN 46601-1830 <br />Phone: 574-235-1751 <br />Fuel Tanks <br />Tires <br />Hubs <br />Wheels <br />REMOVABLE FRONT TOW HOOKS STORED ON <br />THE CHASSIS FRAME <br />BUMPER MOUNTING FOR SINGLE LICENSE <br />PLATE <br />FENDER AND FRONT OF HOOD MOUNTED <br />FRONT MUDFLAPS <br />GRADE 8 THREADED HEX HEADED FRAME <br />FASTENERS <br />NO LH FUEL TANK <br />60 DIESEL GALLON EQUIVALENT (DGE) <br />COMPRESSED NATURAL GAS (CNG) FUEL <br />TANKS STACKED BACK OF CAB, 4X16" <br />DIAMETER, 577 MM OVERALL LENGTH <br />STACKED TRANSVERSE MOUNTING BACK OF <br />CAB FOR CNG TANKS WITH PAINTED <br />SHIELDING <br />PLAIN STEP FINISH <br />LH CNG NGV1 STANDARD FILL RECEPTACLE <br />AND DUST CAP AND DEFUELER RECEPTACLE <br />CNG FUEL HEATING SYSTEM <br />SINGLE CNG FUEL LINE WITH IN -LINE <br />SOLENOID SHUTOFF VALVE AND PRESSURE <br />REGULATOR <br />STAINLESS STEEL AND SYNTHETIC RUBBER <br />FLEXIBLE FUEL LINES - NATURAL GAS SERVICE <br />MICHELIN XZU-S2 315/80R22.5 20 PLY RADIAL <br />FRONT TIRES <br />MICHELIN X WORKS XDY 315/80R22.5 20 PLY <br />RADIAL REAR TIRES <br />MICHELIN XZU-S2 315/8OR22.5 20 PLY RADIAL <br />SPARE TIRE <br />MICHELIN X WORKS XDY 315/80R22.5 20 PLY <br />RADIAL ADDITIONAL SPARE TIRE <br />CONMET PRESET PLUS IRON FRONT HUBS <br />WEBB IRON REAR HUBS <br />ACCURIDE 29039 22.5X9.00 10-HUB PILOT 5.25 <br />INSET 5-HAND STEEL DISC FRONT WHEELS <br />Application Version .008 ®® 01/03/2017 11:17 AM <br />Data Version PRL-15M5M.007 <br />South Bend CNG grapple 2017 Page 9 of 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.