My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Lochmueller Group, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Agreements, Contracts, Proposals, and Addenda
>
PSA - Lochmueller Group, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 9:57:43 AM
Creation date
1/3/2017 3:04:42 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
12/22/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This is EXHIBIT C2, consisting of 7 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated December 22. 2016. <br />Payments to Engineer for Services and Reimbursable Expenses <br />COMPENSATION PACKET BC-2: Basic Services — Standard Hourly Rates <br />Article 2 of the Agreement is supplemented to include the following agreement of the parties: <br />ARTICLE 2 — OWNER'S RESPONSIBILITIES <br />C2.01 Compensation For Basic Services (other than Resident Project Representative) —Standard Hourly <br />Rates Method of Payment <br />A. Owner shall pay Engineer for Basic Services set forth in Exhibit A, except for services of Engineer's <br />Resident Project Representative, if any, as follows: <br />1. An amount equal to the cumulative hours charged to the Project by each class of Engineer's <br />personnel times Standard Hourly Rates for each applicable billing class for all services <br />performed on the Project, plus Reimbursable Expenses and Engineer's Consultants' charges, <br />if any. <br />2. Engineer's Reimbursable Expenses Schedule and Standard Hourly Rates are attached to this <br />Exhibit C2 as Appendices 1 and 2. <br />3. The total compensation for services under Paragraph C2.01 of Exhibit C2 is estimated to be <br />$ 23,400 based on the following estimated distribution of compensation: <br />a. Bidding or Negotiating Phase $ 8,700 <br />b. Construction Phase $ 6,700 <br />c. Utility Coordination $ 8,000 <br />4. Engineer may alter the distribution of compensation between individual phases of the work <br />noted herein to be consistent with services actually rendered, but shall not exceed the total <br />estimated compensation amount unless approved in writing by Owner. See also C2.03.C.2 <br />below. <br />5. The total estimated compensation for Engineer's services included in the breakdown by <br />phases as noted in Paragraph C2.01.A.3 incorporates all labor, overhead, profit, <br />Reimbursable Expenses and Engineer's Consultants' charges. <br />6. The amounts billed for Engineer's services under Paragraph C2.01 will be based on the <br />cumulative hours charged to the Project during the billing period by each class of Engineer's <br />employees times Standard Hourly Rates for each applicable billing class, plus Reimbursable <br />Expenses and Engineer's Consultants' charges. <br />Page 1 <br />Exhibit C —Compensation Packet BC-2: Basic Services (other than RPR) — Standard Hourly Rates Method of Payment <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright C 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.