My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - Corby Blvd Sidewalk Improvements - Walsh & Kelly, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Opening of Quotations
>
Opening of Quotes - Corby Blvd Sidewalk Improvements - Walsh & Kelly, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 2:57:32 PM
Creation date
1/3/2017 2:54:26 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/22/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
QUOTE/PROPOSAL <br />CITY OF SOUTH BEND <br />PROJECT NAME Corby Boulevard Sidewalk Improvements <br />PROJECT NO. 116-087 —Division A (Twyckenham Drive to Clemens Drive) <br />QUOTES DUE December 22, 2016 at 10:30 a.m. <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />CONSTRUCTION <br />1 <br />LS <br />$ <br />ENGINEERING <br />650.00 <br />650.00 <br />2 <br />CPM SCHEDULE <br />1 <br />LS <br />25.00 <br />$25.00 <br />3 <br />CPM SCHEDULE, MONTHLY <br />2 <br />EA <br />$ <br />UPDATE <br />5.00 <br />10.00 <br />4 <br />MOBILIZATION AND <br />1 <br />LS <br />$ <br />DEMOBILIZATION <br />1,500.00 <br />1,500.00 <br />5 <br />TREE, REMOVE <br />2 <br />EACH <br />500.00 <br />$1,000.00 <br />6 <br />CLEARING AND GRUBBING <br />1 <br />LS <br />6,000.00 <br />$6,000.00 <br />7 <br />PAVEMENT, CONCRETE, <br />24 <br />SYS <br />$ <br />REMOVE <br />50.00 <br />1,200.00 <br />8 <br />CURB, CONCRETE, REMOVE <br />80 <br />LFT <br />20.00 <br />$1, 600.00 <br />9 <br />EXCAVATION, COMMON <br />27 <br />CYS <br />150.00 <br />$4,050.00 <br />10 <br />BORROW <br />18 <br />CYS <br />150.00 <br />$2,700.00 <br />11 <br />SIDEWALK, CONCRETE, 4IN <br />325 <br />SYS <br />50.00 <br />$16,250.00 <br />12 <br />CURB RAMP, CONCRETE <br />12 <br />SYS <br />200.00 <br />$2 400.00 <br />13 <br />CURB, CONCRETE <br />55 <br />LFT <br />35.00 <br />$1,925.00 <br />14 <br />CURB, CONCRETE, ROLLED <br />33 <br />LFT <br />35.00 1$1,155.00 <br />15 <br />CASTING, ADJUST TO GRADE <br />2 <br />EACH <br />250.00 <br />$500.00 <br />16 <br />SPRINKLER REPAIR <br />1000 <br />DOL <br />$1.00 <br />$1,000.00 <br />ALLOWANCE <br />17 <br />SODDING, NURSERY AND <br />130 <br />SYS <br />$7,150.00 <br />TOPSOIL <br />55.00 <br />18 <br />MAINTENANCE OF TRAFFIC <br />1 <br />LS <br />6,550.00 <br />$6,550.00 <br />Total Amount of Quote <br />$55 , 665.00 <br />Version 10/18/2016 Page - 28 Public Works Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.