Laserfiche WebLink
s =11 l <br />Established 1911 <br />berglundco.com <br />Corporate Office <br />8410 S. South Chicago Ave. <br />Chicago, IL 60617 <br />773.374.1000 <br />Chicago Office <br />111 E, Wacker Dr., Ste. 2450 <br />Chicago, IL 60601 <br />312.726.6624 <br />Indiana Office <br />126 Venturi Dr. <br />Chesterton, IN 46304 <br />219.926.4246 <br />City of South Bend, Indiana <br />Contractor's Bid For Public Work <br />JMS Facade Work — Project No. 116-048 <br />Response to Part II, Section II <br />Plan and Equipment Questionnaire <br />Item 1. Plan for Proposed Work <br />The project will be completed in 5 phases as indicated below. Berglund <br />Construction will self -perform 100% of the work excluding the new <br />glass/aluminum storefront which will be furnished and installed by others. <br />Phase 1— Initial Investigation & Submittal Procedure <br />Anticipated Start Date: February 2017 <br />• Existing building will be surveyed and investigations performed <br />• Analysis will be performed to sample historic mortars <br />• Selective terra cotta units will be removed for duplication by terra cotta <br />manufacturer <br />• Color samples or terra cotta will be provided to owner for review and <br />approval <br />o Lead-time for new terra cotta is 6 — 8 months after approval <br />• Color samples of granite will be provided to owner for review and <br />approval <br />• Submittals will be provided for review and approval to Owner, Architect <br />and State of Indiana Historical Society <br />Phase 2 — Demolition & Board <br />Anticipated Start Date: March 2017 <br />• Demolition of existing storefront will be performed <br />• Weather tight board up of storefront will be performed <br />• Demolition of existing granite at columns will be performed <br />• Verify R.O. for new storefront <br />Phase 3 — Material Fabrication <br />Anticipated Start Date: March 2017 <br />• Terra Cotta Fabrication —Anticipated 6-8 Month Duration <br />• Granite Fabrication <br />• Storefront Fabrication <br />Phase 4—Granite & Terra Cotta Installation <br />Anticipated Start Date: August / September 2017 <br />• Install terra cotta <br />• Install granite <br />Phase 5—Storefront Installation <br />Anticipated Start Date: September 2017 <br />• Install storefront <br />Estimated Project Completion: October / November 2017* <br />*Lump sum bid amount takes into consideration specified liquidated damages. <br />