My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Industrial Discharge Permit - Royal Adhesives and Sealants
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Licenses and Permits
>
Industrial Discharge Permit - Royal Adhesives and Sealants
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 2:19:08 PM
Creation date
1/3/2017 2:37:26 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Permit Applications
Document Date
12/22/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FYI ... Royal Adhesives and Sealants's permit includes the following: <br />1) Royal Adhesives and Sealants shall report flow monthly. <br />2) Royal Adhesives and Sealants's Authorized Representative shall sign all reports including <br />but not limited to Periodic Compliance Reports (PCR), Slug Control Plans, Flow <br />Measurement Plans, and corrective actions in response to permit violations. <br />3) Royal Adhesives and Sealants, LLC shall submit a "Flow Measurement Plan" within ninety (90) <br />days of the effective date of this permit, as described in Part III (1). <br />4) Royal Adhesives and Sealants, LLC shall notify the Pretreatment Group orally within twenty four <br />(24) hours of becoming aware of a permit violation, and must follow up in writing with details and <br />corrective action within five (5) days. <br />5) Royal Adhesives and Sealants, LLC shall submit a Slug Control Plan within ninety (90) days of <br />the effective date of this permit. This plan shall be resubmitted every even numbered year, 2016, <br />2018, 2020... Please see Part (III ) (F) for details. <br />6) Only the Authorized Representative shall be required to sign the certification statement <br />found in Part III (A) (3). <br />7) Section Part IV (B) (15) has been added in order to clarify the requirements concerning the <br />Authorized Representative. <br />8) For all after hour (after 4:30 PM) required oral notifications call: 574-277-8515 and dial <br />zero (0) to reach an operator. <br />If you have any questions, feel free to contact Manny Bueno at (574) 235-5798 or via email at <br />mbueno@southbendin.gov <br />}Sincerely, <br />Manuel "Manny" Bueno <br />Pretreatment Coordinator <br />City of South Bend <br />Division of Environmental Services <br />3113 Riverside Drive <br />South Bend, IN 46628 <br />574-235-5798 <br />mbueno@soutlibendin.gov <br />enclosures: industrial wastewater discharge draft permit <br />cc: file <br />
The URL can be used to link to this page
Your browser does not support the video tag.