My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 2 - WWTP Grit and Screenings Improvements Proj No 114-075 - Thieneman Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Change Orders
>
Change Order No 2 - WWTP Grit and Screenings Improvements Proj No 114-075 - Thieneman Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 1:47:17 PM
Creation date
1/3/2017 2:24:52 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/22/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�i <br />THI <br />A:STRUCTION.INC. <br />September 19, 2016 <br />Greeley and Hansen <br />7820 Innovation Blvd. Suite 150 <br />Indianapolis; IN 46278 <br />Attn: Mr. Trent Montemayor <br />Subj: South Bend Grit and Screenings <br />Proposed Change Order #7: Analog Feed Cards to Existing Rotork Actuators <br />Mr. Montemayor: <br />Please refer to the detail and proposal for Change Order Request 47 to furnish and install five (5) <br />analog feedback cards to the existing rotork actuators. This proposal was requested in the <br />response to RFI #9. A time extension of fifty (50) calendar days will be required to procure <br />materials for this change. The proposal includes furnishing, installation, and calibration of the <br />cards. Please process an increase to the contract amount of Seven Thousand Six Hundred Forty <br />Sue Dollars and Seventy Six cents ($7,646.76) in the next change order issued for PCO #7. <br />This proposed change order is being requested at a point when contractual work is near 100% <br />complete. Acceptance of this proposal, and the associated time extension, will not impact release <br />of retention on contract work complete at the original substantial completion date. Further, <br />acceptance of either PCO #6, PCO #7, or both will require only a single time extension of 50 <br />days. Feel free to contact me with any questions. <br />Respectfully, <br />Matt McCoy <br />Project Manager <br />Cc: Field, File, Accounting <br />INDUSTRIAL • MUNICIPAL CONTRACTOR <br />521 W. 841 Dr. • Suite A • Merrillville, IN 46410 • 219-947-4700 • Fax 219-947-4711 <br />17219 Foundation Plcwy • Westfield, IN 46074. 317-867-3462 • Fax 317-867-3463 <br />
The URL can be used to link to this page
Your browser does not support the video tag.