My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bid Award - One or More 2016 or Newer One Ton Two Wheel Drive Dump Truck Spec AC - Jordan Ford
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Award Bids
>
Bid Award - One or More 2016 or Newer One Ton Two Wheel Drive Dump Truck Spec AC - Jordan Ford
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 1:27:51 PM
Creation date
1/3/2017 2:18:43 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/22/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br />A:`terrmative (t <br />Tue[Systems <br />Fresno, CA ` Elkhart, IN <br />Will Gutilla 559-289-8522 $ iuiFIE: <br />will a@al altfuels.com +uaxi s <br />DATE QUOTE <br />11 /30/2016 <br />16113OWG <br />NAME ADDRESS <br />Deb Starkweather <br />Jordan Automotive Group <br />Mishawaka, IN <br />P.O. NO. <br />FORD DROP SHIP <br />I TERMS <br />REP <br />END USER <br />FOB <br />88MNZ4 <br />I Due on Completion <br />WG <br />South Bend <br />Elkhart, IN <br />ITEM <br />DESCRIPTION <br />QTY <br />PRICE EA. <br />EPA Certified Bi-Fuel CNG System <br />_ <br />F350-W9-UB-BF <br />9 GGE 2017 Ford F-350 6.21- DRW Cab/Chassis 169" W/B <br />1 <br />$9,490.00 <br />CNG Tanks Mounted Underbody Aft -Azle; OEM Midship Gasoline <br />Tank Must Be Ordered <br />All items in "Alternate 1" section of South Bend bid sent by D <br />Starkweather on 11-23-16 are included, EXCEPT: <br />i <br />• Tanks to be installed are Type 1, not Type 4, which is industry <br />standard for this vehicle type. <br />—� <br />• Tanks will amount to 9 GGE, not the required 20 GGE. Because <br />O CN <br />this is a bi-fuel unit with a gasoline tank underbody, the most�� <br />Q� <br />underbody CNG capacity is 9 GGE. More GGE can be achieved <br />I <br />with tanks not mounted underbody, such as back -of -cab tanks. <br />• No methane detector is provided. It is not recommended on this <br />vehicle type. <br />Note: Quote is contingent on 2017 EPA certification. <br />Note: Quote is good 60 days and is FOB Elkhart, IN. <br />Note: CNG tanks will have approximately 1000psi upon completion. <br />Note: After receipt of purchase order, vehicle will be put into production schedule. <br />Note: After parts and vehicle arrive please allow 25 working days for delivery of first vehicle, and approximately 5 <br />days for each additional vehicle. <br />Note: Vehicle must be ordered with Ford's Gaseous Fuel Prep Engine option. <br />BUYER AUTHORIZATION : Buyer's signature below is acceptance to purchase the product identified above. <br />Signature - Date: <br />"- <br />,�-We.06- Floo�0ei o <br />-�(- Uf1 ,"I <br />6,lseow lit--r-vee <br />opj'' on <br />s9eai <br />
The URL can be used to link to this page
Your browser does not support the video tag.