My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Quotation Award - 12th Floor Remodel Proj No 116-125 - Brown & Brown General Contractors
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Award Quotations
>
Quotation Award - 12th Floor Remodel Proj No 116-125 - Brown & Brown General Contractors
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 1:36:51 PM
Creation date
12/15/2016 2:08:36 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/13/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Bourn ae <br />o ^o <br />CITY OF SOUTH BEND, INDIANA <br />y, rvAR, y <br />CONTRACTOR'S QUOTE FOR PUBLIC WORK <br />!A6> ' <br />PROJECT NAME: 12`h Floor Remodel <br />PROJECT NO. 116.125 <br />QUOTES DUE November 22, 2016. 9:30 a.m. Local Time <br />(Must be completed for all quotes. Please type or print) <br />Date: November 22, 2016 Firm: Brown & Brown General Contractors, Inc. <br />Address: 124 S. Elkhart St., PO Box 487 <br />City/State/Zip: Wakarusa, IN 46573 Telephone Number: (574 ) 862-2171 <br />Agent of Bidder (if Applicable): <br />Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the <br />public works project of: <br />12th Floor Remodel, project no. 116-125 <br />the City of South Bend, Indiana, in accordance with plans and specifications prepared by: <br />The City of South Bend, Department of Public Works <br />and dated _Nov. 7, 2016 ] for the sum of (enter the Total Quote as shown on the Proposal) <br />A4Y. cVCA/ 7i ovsAnVvt FOUr I&Vd e4lf d /aU/1r,Y Opp (s 74 <br />(linter Sum of Total Quote plus Alternates shown on Proposal) ( umerical) <br />If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice. Any <br />addendums attached will be specifically referenced at the applicable page. <br />If additional units of material included in the contract are needed, the cost of units must be the same as that <br />shown in the original contract if accepted by the City of South Bend. If the quote is to be awarded on a unit basis, <br />the itemization of the units shall be shown on a separate attachm <br />c <br />BY <br />(Signature) <br />Eric Brown, President <br />(Printed Name of Person Signing) <br />ACCEPTANCE <br />The above quote is accepted this 7' day of 20 G <br />Subject to the following conditions: <br />Version 10/18/2016 Page - 7 Public Works Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.