Laserfiche WebLink
Change Order No. 36 <br />One- Way to Two -Way Street Conversion <br />Division A <br />Project No. 116-001 <br />OWNER: City of South Bend <br />ENGINEER: Lochmueller Group, Inc. <br />Myron Cohagan <br />CONTRACTOR: Rieth-Riley Construction <br />PROJECT: South Bend One -Way to Two -Way Conversion Division A <br />Project No. 116-001 <br />SUBJECT: Water Line Relocation on Chippewa at Main St. <br />ISSUE DATE: November 21, 2016 <br />This Change Order to the Contract document shall supplement, amend, and shall become a <br />part of, and be incorporated as an Addendum to the Contract. <br />The following is a summary and description of the revisions to the Contract by this Change <br />Order: <br />1. A pay item is being added to account for the work of relocating a 12 inch water line <br />on Chippewa near Main St. A 12 inch water line on Chippewa running east and <br />west had to be lowered, due to a conflict with the drainage pipe that ran from <br />structure 63 to drainage structure 66. The water line was lowered 2 feet by using 4 <br />ninety degree elbows and 20 feet of pipe. <br />The following sections of the Contract Documents are revised as a result of the above changes: <br />BIDDING AND CONTRACT REQUIREMENTS: <br />1. Bid/Proposal Form: <br />Division A: <br />Add EWA Line Item No. 248: Relocate water line, 1 LSM @ $12,882.86/LSM for a total <br />addition of $12,882.86. <br />SPECIFICATIONS: <br />None <br />DRAWINGS: <br />None <br />Sheet 1 of 3 <br />