Laserfiche WebLink
Mr. Myron Cohagan <br />Lochmueller Group <br />130 South Main St. Suite 300 <br />South Bend, IN 46601 <br />TH `M/LEY <br />November 141, 2016 <br />RE: Division A EWA 006, Remove & Reset Pipe & Structure due to Water Main Conflict <br />As you are aware, during installation of structures 47, 48 & 51 a water main was discovered that <br />was in conflict with the proposed elevations of the new pipe runs. We were directed to remove <br />and reinstall the pipe and structures at a lower elevation to avoid the water main conflict. In <br />addition all three structures required field modifications to accommodate the new pipe elevation. <br />The following is Rieth-Riley's cost to perform this work. <br />Division B• <br />Item # <br />Qty <br />I Unit <br />Description <br />Unit Price <br />Total <br />EWA <br />1 <br />LSM <br />Remove and Reset Pipe and <br />Structures to avoid Water Main <br />$12,970.87 <br />$12,970.87 <br />_ <br />Total: <br />$12,970.87 <br />Attached is all the documentation that supports this pricing. Please let me know if you have any <br />questions or require any additional information. <br />Respectfully, <br />Scott Ki,rk,�c�h-i,ck, <br />Scott Kirkpatrick <br />Estimator/Prof ect Manager <br />Rieth-Riley Construction <br />25200 S.R. 23 • SOUTH BEND, INDIANA 46614 • TELEPHONE: (574) 288-8321 • FAX: (574) 233-3464 <br />