My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 7 - SB One Way to Two Way Conversion Proj No 116-001A - Rieth Riley Construction Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Change Orders
>
Change Order No. 7 - SB One Way to Two Way Conversion Proj No 116-001A - Rieth Riley Construction Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 1:56:08 PM
Creation date
12/14/2016 3:12:45 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/13/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Change Order No. 35 <br />One- Way to Two -Way Street Conversion <br />Division A <br />Project No. 116-001 <br />OWNER: City of South Bend <br />ENGINEER: Lochmueller Group, Inc. <br />Myron Cohagan <br />CONTRACTOR: Rieth-Riley Construction <br />PROJECT: South Bend One -Way to Two -Way Conversion Division A <br />Project No. 116-001 <br />SUBJECT: Remove and Reset Pipe & Structure due to Water Main Conflict <br />ISSUE DATE: November 16, 2016 <br />This Change Order to the Contract document shall supplement, amend, and shall become a <br />part of, and be incorporated as an Addendum to the Contract. <br />The following is a summary and description of the revisions to the Contract by this Change <br />Order: <br />1. A pay item is being added to account for the work of removing and resetting <br />structure 48 and 40 Ift of pipe, due to a conflict with an existing water main. The <br />structure and pipe were lowered 2 feet. <br />The following sections of the Contract Documents are revised as a result of the above changes: <br />1: 1. • <br />1. Bid/Proposal Form: <br />Division A: <br />Add EWA Line Item No. 247: Remove and Reset Pipe & Structure, 1 LSM @ <br />$12,970.87/LSM for a total addition of $12,970.87. <br />SPECIFICATIONS: <br />None <br />DRAWINGS: <br />None <br />END OF CHANGE ORDER NO. 31 <br />Sheet 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.