My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 7 - SB One Way to Two Way Conversion Proj No 116-001A - Rieth Riley Construction Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Change Orders
>
Change Order No. 7 - SB One Way to Two Way Conversion Proj No 116-001A - Rieth Riley Construction Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 1:56:08 PM
Creation date
12/14/2016 3:12:45 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/13/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TKT00361292 <br />Billed To: RIETWREILY CONSTRUCTION CO. INC. <br />25200 SR 23 <br />SOUTH BEND IN 46614 <br />Operator(s) <br />MORAN ERIC <br />Job Location <br />Chippewa Ave. and Michigan St., South Bend <br />Company: <br />Badger Daylighting Corp Select Truck <br />Job Name/#: <br />Chippewa Ave. and Michigan St., South Bend - Hyd <br />Area <br />NORTHERN INDIANA CORP <br />Ticket Items <br />Badger Daylighting Corp <br />75 Remittance Drive Suite 3185 <br />Chicago, Illinois, United States, 60675-3185 <br />Ph: (877) 3BADGER Fax: (877) 741-3134 <br />Emait AR Dept <br />Job Number J00232602 <br />Ticket Date: 11/09/2016 <br />Paper Ticket #: 392627 <br />PO: 3610569 <br />Project Name/AFE: <br />Customer Rep: Eric Dhoore <br />Customer Rep #: 219-380-6986 <br />Industry <br />Item Unit # / Personnel Quantity U of M Rate Amount <br />HYDROVAC W/ 1 MAN CREW - HOURLY - 01 1265, HYDROVAC 8.00 HR 240.00 1,920.00 <br />STANDARD RATE <br />HYDROVAC W/ 1 MAN CREW - HOURLY - 02 1265, HYDROVAC 1.00 HR 275.00 275.00 <br />OVERTIME RATE <br />MOBILIZATION / DEMOBILIZATION 1265, HYDROVAC 0.50 HR 175.00 87.50 <br />TIME-01-OPERATOR 1-DAY SHIFT <br />Approved By: <br />Work Order #1 Job # 3610569 cost code 41910 <br />Ticket Notes <br />MORAN, ERIC 0.00 HR 0.00 0.00 <br />Total $2,282.50 <br />Taxes included if applicable. <br />Job Description <br />Intersection of Michigan St and Chippawa St South Bend IN 11/09/2016 <br />Unload at Reith & Riley site on St Rd 23 <br />Work Description <br />Cut trench for new drainage tile expose gas main and fiber and electrical service lines 11/09/2016 <br />Spire Wireless Field Ticketing <br />Visit us at w .spiradata.com Ver 1.9.0 Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.