Laserfiche WebLink
Change Order No. 37 <br />One- Way to Two -Way Street Conversion <br />Division A <br />Project No. 116-001 <br />OWNER: City of South Bend <br />ENGINEER: Lochmueller Group, Inc. <br />Myron Cohagan <br />CONTRACTOR: Rieth-Riley Construction <br />PROJECT: South Bend One -Way to Two -Way Conversion Division A <br />Project No. 116-001 <br />SUBJECT: Palmer Sewer Line Connection. <br />ISSUE DATE: November 22, 2016 <br />This Change Order to the Contract document shall supplement, amend, and shall become a <br />part of, and be incorporated as an Addendum to the Contract. <br />The following is a summary and description of the revisions to the Contract by this Change <br />Order: <br />1. A pay item is being added to account for the work of reconnecting the Palmer <br />Funeral Home sewer line. While installing the new storm sewer line Structures 77 <br />and structure 42 were eliminated. Unbeknownst to the designer the Palmer sewer <br />line was blind taped into the pipe that ran between structures 77 and 42. A new <br />line was then connected to the city sewer. <br />The following sections of the Contract Documents are revised as a result of the above changes: <br />BIDDING AND CONTRACT REQUIREMENTS: <br />1. Bid/Proposal Form: <br />Division A: <br />Add EWA Line Item No. 249: Sewer Line Connection, 1 LSM @ $7,262.60/LSM for a <br />total addition of $7,262.60, <br />SPECIFICATIONS: <br />None <br />DRAWINGS: <br />None <br />Sheet 1 of 3 <br />