Laserfiche WebLink
SUBCONTRACTORS 109.04 (fl <br />WEEK ENDING: November 18, 2016 <br />Indiana Earth Water Line Reroute at Chippewa 1 $11.812.001 <br />TOTAL SUBCONTRACT WEEK ENDING $11,812.00 (29) <br />10 %. x LINE (30) $3,000.00 OR LESS $300.00 (31) <br />7 %x LINE (30) OVER $3,000.00 $616.84 (32) <br />GRAND TOTAL FOR SUBCONTRACTORS: LINES (30)+ (31)+(32) $12,728.84 (33) <br />TOTAL OF WORK COMPLETED FOR THE WEEK <br />TOTAL LINES (12), (17), (22), (28) & (33) <br />1.1 % OF BOND RATE BASED UPON LINE (34) <br />10 % x LINE (35) <br />TOTAL EXTRA WORK LINES: (34) + (35) + (36) <br />Page 3 of 3 <br />$12,728.84 (34) <br />$140.02 (35) <br />$14.00 (36) <br />$12,882.86 (37) <br />