My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 7 - SB One Way to Two Way Conversion Proj No 116-001A - Rieth Riley Construction Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Change Orders
>
Change Order No. 7 - SB One Way to Two Way Conversion Proj No 116-001A - Rieth Riley Construction Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 1:56:08 PM
Creation date
12/14/2016 3:12:45 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/13/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SUBCONTRACTORS 109.04 (fl <br />WEEK ENDING: November 18, 2016 <br />Indiana Earth Water Line Reroute at Chippewa 1 $11.812.001 <br />TOTAL SUBCONTRACT WEEK ENDING $11,812.00 (29) <br />10 %. x LINE (30) $3,000.00 OR LESS $300.00 (31) <br />7 %x LINE (30) OVER $3,000.00 $616.84 (32) <br />GRAND TOTAL FOR SUBCONTRACTORS: LINES (30)+ (31)+(32) $12,728.84 (33) <br />TOTAL OF WORK COMPLETED FOR THE WEEK <br />TOTAL LINES (12), (17), (22), (28) & (33) <br />1.1 % OF BOND RATE BASED UPON LINE (34) <br />10 % x LINE (35) <br />TOTAL EXTRA WORK LINES: (34) + (35) + (36) <br />Page 3 of 3 <br />$12,728.84 (34) <br />$140.02 (35) <br />$14.00 (36) <br />$12,882.86 (37) <br />
The URL can be used to link to this page
Your browser does not support the video tag.