Laserfiche WebLink
Mr. Myron Cohagan November 21", 2016 <br />Lochmueller Group <br />130 South Main St. Suite 300 <br />South Bend, IN 46601 <br />RE: Division A EWA 012, Water Line Relocation on Chippewa at Main St <br />As you are aware, an existing water main was in conflict with the new storm pipe and structure <br />at the corner of Chippewa and Main Street. We were directed to relocate the existing water main <br />to avoid the conflict. The following is Rieth-Riley's cost to perform this additional work. <br />Division B• <br />Item # <br />Qty <br />Unit <br />Description <br />Unit Price <br />Total <br />Water Line Relocation to <br />EWA <br />1 <br />LSM <br />Avoid Storm Sewer on <br />$12,882.86 <br />$12,882.86 <br />Chippewa at Main Street <br />Total: <br />$12,882.86 <br />Attached is all the documentation that supports this pricing. Please let me know if you have any <br />questions or require any additional information. <br />Respectfully, <br />Scott Ki rkp& ri, <br />Scott Kirkpatrick <br />Estimator/Project Manager <br />Rieth-Riley Construction <br />25200 S.R. 23 • SOUTH BEND, INDIANA 46614 • TELEPHONE: (S74) 288-8321 • FAX: (574) 233-3464 <br />