Laserfiche WebLink
CITY OF SOUTH BEND, INDIANA <br />WWTP SECONDARY TREATMENT IMPROVEMENTS <br />CITY PROJECT NO. 114-053 <br />REQUEST FOR INTERPRETATION <br />Contractor: Thieneman Construction, Inc. RFI NO RFI-110 <br />Date <br />Transmmitted: <br />Date Response <br />Requested: <br />09/02/2016 <br />09/09/2016 <br />Subject: Power to SCADA Cabinets <br />Specification Section and <br />Paragraph: <br />Drawings: <br />INTERPRETATION REQUESTED: <br />Per Sweney Eloorle: <br />Date <br />Received: <br />09/02/2016 <br />Date Response Transmltled: 10/17/2016 <br />Do the SCADA cabinets In Gallery 2 and 3 require a power teed? It so, please advise from where, whet size, etc. <br />Requested Sy: Allen Goarder Derv: OOM212010 <br />ENGINEER'S RESPONSE: <br />Provide power for LCP-201 and LCP-301 from 120V 20A circuits In power panels in respective galleries. Use 3/4" rigid <br />steel conduits and two (2) #12 THWN-2, one (1) #12 Gnd for circuit. <br />Signaturs(s): Gary Cresaey Omer Martin <br />Dab: 10/17/2016 <br />