My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 6 - WWTP Secondary Treatment Improvements Proj No 114-053 - Thieneman Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Change Orders
>
Change Order No. 6 - WWTP Secondary Treatment Improvements Proj No 114-053 - Thieneman Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 1:55:38 PM
Creation date
12/14/2016 3:10:29 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/13/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SOUTH BEND, INDIANA <br />WWTP SECONDARY TREATMENT IMPROVEMENTS <br />CITY PROJECT NO. 114-053 <br />REQUEST FOR INTERPRETATION <br />Contractor: Thieneman Construction, Inc. RFI NO RFI-110 <br />Date <br />Transmmitted: <br />Date Response <br />Requested: <br />09/02/2016 <br />09/09/2016 <br />Subject: Power to SCADA Cabinets <br />Specification Section and <br />Paragraph: <br />Drawings: <br />INTERPRETATION REQUESTED: <br />Per Sweney Eloorle: <br />Date <br />Received: <br />09/02/2016 <br />Date Response Transmltled: 10/17/2016 <br />Do the SCADA cabinets In Gallery 2 and 3 require a power teed? It so, please advise from where, whet size, etc. <br />Requested Sy: Allen Goarder Derv: OOM212010 <br />ENGINEER'S RESPONSE: <br />Provide power for LCP-201 and LCP-301 from 120V 20A circuits In power panels in respective galleries. Use 3/4" rigid <br />steel conduits and two (2) #12 THWN-2, one (1) #12 Gnd for circuit. <br />Signaturs(s): Gary Cresaey Omer Martin <br />Dab: 10/17/2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.