Laserfiche WebLink
CITY OF SOUTH BEND, INDIANA <br />WWTP SECONDARY TREATMENT IMPROVEMENTS <br />CITY PROJECT NO. 114-053 <br />REQUEST FOR INTERPRETATION <br />Contractor: Thlensman Construction, Inc. RFI NO RFW74A <br />Date <br />Tranemmided: <br />Date Response <br />Requested: <br />05/2312016 <br />05/30/2016 <br />SubJect: Expansion Joints at Aeration Channel <br />Specification Section and <br />Paragraph: <br />Drawings: S-05 A S-21 <br />Date <br />Received: <br />05/23/2015 <br />Date Response Transmitted: 05/28/2015 <br />INTERPRETATION REQUESTED: <br />As stated in RFI e074, when the aeration channel was drained, we discovered unforeseen expansion Joints In the existing floor. The <br />drawings and the approved rebar drawings did not cell for any expansion Joints. We propose to install expansion Joints and control <br />Joints In the new stab and divider wall per the attached dmWrvg and track the additional costs on a T&M Basis. Please confirm as <br />soon as possible we can proceed in this manner. <br />Requested By: Allen Gaarder Daw: 05/23/2016 <br />ENGINEER'S RESPONSE: <br />The Contractor's proposed approach is acceptable. <br />Slgnature(s): Jared Stewart oau: 05/2612016 <br />