Change Order No. 6 - WWTP Secondary Treatment Improvements Proj No 114-053 - Thieneman Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Change Orders
>
Change Order No. 6 - WWTP Secondary Treatment Improvements Proj No 114-053 - Thieneman Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 1:55:38 PM
Creation date
12/14/2016 3:10:29 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/13/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SOUTH BEND, INDIANA <br />WWTP SECONDARY TREATMENT UsApR01 <br />CITY PROJECT NO. 114-00 <br />CHANGE ORDER PROPOSAL <br />Change Order Proposal No.: 114-053-026 Date: 6/24116 <br />Submitted in Response to Proposal Request <br />Contract Name and No.:. 114-053 South Bend W WTP Secondary Treatment Im2M=g ent1 <br />Contractor: Thieneman Construction, Inc. <br />Subject. As stated in RFI #074, when the aeration channel was drained, we discovered <br />unforeseen expansion joints in the existing floor. The drawings and the approved rebar drawings <br />did not call for any expansion joints. We proposed to install expansion joints and control joints in <br />the new slab and divider wall per the attached drawing and truck the additional costs on a T&M <br />Basis, This PCO is only for the costs incurred to date. <br />The following changes to the Contract are proposed; <br />SCOPE OF WORK: (attach and list supporting information as required; <br />1. Item: TCI — Add Expansion Joints - $5,102 <br />JUSTIFICATION: <br />1. Item: Unforeseen Condition <br />CHANGES IN CONTRACT PRICE AND CONTRACT TIMES: <br />We propose that the Contract Price and Contract Times be changed as follows: <br />For Contract Price, when requested by Engineer, attach detailed cost breakdowns for Contractor and <br />Subcontractors. Supplier quotations, and other iVormation required. <br />For the Contract 71mes, state ininease, decrease, or no change to Contract Times for Substantial Completion, <br />readiness jar final payment, and Milestones, if any. tf increase or decrease, state spec#lc number of days for <br />changes to the Contract Times. <br />Descri lion <br />Contract Timea da a <br />Amount Substantial Final <br />1.Item —TCI <br />$5,102 5 <br />0 <br />2. item — TCI — MarLw : 5% Subs / 15% TCI <br />$765 <br />Total7ftis Change Order Proposal <br />$5,867 5 <br />0 <br />Changes to Milestones, if any: <br />The adjustment proposed is the entire adjustment to the Contract to which the proposer believes it <br />is entitled as a result of the proposed change. <br />Change Order Proposal By: Allen Gearder <br />Signature of Proposer: <br />