My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 6 - WWTP Secondary Treatment Improvements Proj No 114-053 - Thieneman Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Change Orders
>
Change Order No. 6 - WWTP Secondary Treatment Improvements Proj No 114-053 - Thieneman Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 1:55:38 PM
Creation date
12/14/2016 3:10:29 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/13/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Bill of Materials <br />Loose Devices <br />A. NET-103 Panel Components <br />1. Qty. 1 — Patch Panel, Corning WIC-04P <br />2. Qty. 2 — MM LC Conn Plates, Corning, CCH-CP24-A8 <br />3. Qty. 2 — SM LC Conn Plates, Corning, CCH-CP24-A9 <br />B. LCP-201 Panel Components <br />1. Qty. 1 — Patch Panel, Corning, WCH-06P <br />2. Qty. 3 — MM LC Conn Plates, Corning, CCH-CP24-A8 <br />3. City. 3 — SM LC Connector Plates, Corning, CCH-CP24-A9 <br />C. LCP-301 Panel Components <br />1. Qty. 1 — Patch Panel, Corning, WIC-02P <br />2. Qty. 1 — MM LC Conn Plate, Corning, CCH-CP24-A8 <br />3. Qty. 1 — SM LC Conn Plate, Corning, CCH-CP24-A9 <br />H. General Conditions and Clarifications <br />A. Modified detailed engineering drawings will be provided for all equipment supplied under <br />this proposal. <br />B. Installation of these panel components is Included. <br />C. System warranty for the equipment supplied by Wunderlich-Malec as specified. <br />D. Our Standard Terms of Sale are attached. <br />HL Exclusions <br />A. Wunderlich-Malec Environmental specifically excludes the following items. <br />1. Sales or use taxes <br />2. Performance, payment or equipment bonds. <br />3. Unloading of equipment and any common carrier charges levied because of <br />Purchaser's inability to unload the shipment in a timely manner. <br />4. Installation of equipment, instrumentation, or control panels and job site labor other than <br />as specified in this proposal. <br />5. Installation materials, brackets, stands, hangers, wire, cables, fiber optic cables, <br />clamps, piping, etc., not specifically described In our bill of materials. <br />6. Pipe taps, weldolets, threadolets, joint accessories, or other piping materials required <br />for installation or maintenance of the equipment supplied with this proposal. We <br />specifically exclude spare spool pieces that may be required for the maintenance of flow <br />meters and control valves. <br />7. Terminations of field wiring or fiber optic connections in control panels or at the field <br />device. <br />8. Testing of fiber optic cabling systems. <br />Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.