Laserfiche WebLink
EJCDCER <br />EHfJNEE0.5 X.1 CWrtWT <br />LOCUMEhiS C9MMITTEE <br />Change Order No. <br />Date of Issuance: November 23, 2016 Effective Date: <br />Owner: City of South Bend Owner's Contract No.: 114-053 <br />Contractor: Thieneman Construction Contractor's Project No.: <br />Engineer: Arcadis US Engineer's Project No.: 03029034.0000 <br />Project: Secondary Treatment Improvements Contract Name: <br />The Contract is modified as follows upon execution of this Change Order: <br />Description: Incorporation of Contractor's COPS: <br />COP 31112 - FCE Sheeting Obstructions.........................................................................................$22,775.00 <br />COP 35R1-Conduit in Tank 1 Walkway ..................................................... <br />.................................... $4,164.00 <br />COP36- Water Line Rerouting.....................................................................................................$25,943.00 <br />COP37 - Asbestos Removal............................................................................................................$2,402.00 <br />COP46R2 - Fiber Patch Panels........................................................................................................$8,393.00 <br />COP 48R1- Balance of Expansion Joints at Aeration....................................................................$23,692.00 <br />COP 50111- Power for SCADA Cabinets..........................................................................................$1,917.00 <br />COP 53 - Fill Void Under Effluent Channel......................................................................................$1,404.00 <br />Attachments: Contractor's Change Order Proposals <br />CHANGE IN CONTRACT PRICE <br />CHANGE IN CONTRACT TIMES <br />Original Contract Price: <br />Original Contract Times: <br />$ 11 885,000 00 <br />Substantial Completion: July 26, 2017 <br />Ready for Final Payment: August 25 2017 <br />dates <br />Increase from previously approved Change Orders: <br />Increase from previously approved Change Orders: <br />$ 768 678.87 <br />Substantial Completion: 36 <br />Ready for Final Payment: 36 <br />days <br />Contract Price prior to this Change Order: <br />Contract Times prior to this Change Order: <br />$ 12,653,675.87 <br />Substantial Completion: August 31, 2017 <br />Ready for Final Payment: September 30, 2017 <br />dates <br />Increase of this Change Order: <br />Increase of this Change Order: <br />Substantial Completion: 13 <br />$ 90 690.00 <br />Ready for Final Payment: 13 <br />days <br />Contract Price incorporating this Change Order: <br />Contract Times with all approved Change Orders: <br />$ 12,744,365.87 <br />Substantial Completion: September 13, 2017 <br />Ready for Final Payment: October 13, 2017 <br />dates <br />R ENDED, <br />By L. By: <br />Engineer (if required) <br />Title: �j p C� 4 ✓ t,h GerTitle <br />Date: Z /Co Date <br />ACCEPTED: ACCEP ED:� <br />Owner (Authorized Signature) Contra cky Authorized Signature) <br />fi DW^1'Crry rol4IM9%e Title SJL, P-_ M G ✓� . <br />/2•06-Zol(e Date <br />/E AAOKIS&012t7-ra <br />)QON~ iF ^cA4c h rxir r <br />NPPB+ v�L . <br />EJCDC" C-941, Change Order. <br />Prepared and published 2013 by the Engineers Joint Contract Documents Committee, <br />Page 1 of 1 <br />