My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 6 - WWTP Secondary Treatment Improvements Proj No 114-053 - Thieneman Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Change Orders
>
Change Order No. 6 - WWTP Secondary Treatment Improvements Proj No 114-053 - Thieneman Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 1:55:38 PM
Creation date
12/14/2016 3:10:29 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/13/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EJCDCER <br />EHfJNEE0.5 X.1 CWrtWT <br />LOCUMEhiS C9MMITTEE <br />Change Order No. <br />Date of Issuance: November 23, 2016 Effective Date: <br />Owner: City of South Bend Owner's Contract No.: 114-053 <br />Contractor: Thieneman Construction Contractor's Project No.: <br />Engineer: Arcadis US Engineer's Project No.: 03029034.0000 <br />Project: Secondary Treatment Improvements Contract Name: <br />The Contract is modified as follows upon execution of this Change Order: <br />Description: Incorporation of Contractor's COPS: <br />COP 31112 - FCE Sheeting Obstructions.........................................................................................$22,775.00 <br />COP 35R1-Conduit in Tank 1 Walkway ..................................................... <br />.................................... $4,164.00 <br />COP36- Water Line Rerouting.....................................................................................................$25,943.00 <br />COP37 - Asbestos Removal............................................................................................................$2,402.00 <br />COP46R2 - Fiber Patch Panels........................................................................................................$8,393.00 <br />COP 48R1- Balance of Expansion Joints at Aeration....................................................................$23,692.00 <br />COP 50111- Power for SCADA Cabinets..........................................................................................$1,917.00 <br />COP 53 - Fill Void Under Effluent Channel......................................................................................$1,404.00 <br />Attachments: Contractor's Change Order Proposals <br />CHANGE IN CONTRACT PRICE <br />CHANGE IN CONTRACT TIMES <br />Original Contract Price: <br />Original Contract Times: <br />$ 11 885,000 00 <br />Substantial Completion: July 26, 2017 <br />Ready for Final Payment: August 25 2017 <br />dates <br />Increase from previously approved Change Orders: <br />Increase from previously approved Change Orders: <br />$ 768 678.87 <br />Substantial Completion: 36 <br />Ready for Final Payment: 36 <br />days <br />Contract Price prior to this Change Order: <br />Contract Times prior to this Change Order: <br />$ 12,653,675.87 <br />Substantial Completion: August 31, 2017 <br />Ready for Final Payment: September 30, 2017 <br />dates <br />Increase of this Change Order: <br />Increase of this Change Order: <br />Substantial Completion: 13 <br />$ 90 690.00 <br />Ready for Final Payment: 13 <br />days <br />Contract Price incorporating this Change Order: <br />Contract Times with all approved Change Orders: <br />$ 12,744,365.87 <br />Substantial Completion: September 13, 2017 <br />Ready for Final Payment: October 13, 2017 <br />dates <br />R ENDED, <br />By L. By: <br />Engineer (if required) <br />Title: �j p C� 4 ✓ t,h GerTitle <br />Date: Z /Co Date <br />ACCEPTED: ACCEP ED:� <br />Owner (Authorized Signature) Contra cky Authorized Signature) <br />fi DW^1'Crry rol4IM9%e Title SJL, P-_ M G ✓� . <br />/2•06-Zol(e Date <br />/E AAOKIS&012t7-ra <br />)QON~ iF ^cA4c h rxir r <br />NPPB+ v�L . <br />EJCDC" C-941, Change Order. <br />Prepared and published 2013 by the Engineers Joint Contract Documents Committee, <br />Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.